5
1.
INTRODUCTION
1.1.1
Purpose of the document
This document is a guide to the installation, configuration, and commissioning of the
GE552Y051, code
GE552Y051, hereinafter referred to as GE552Y051
. This document is intended for technical personnel with
an average knowledge of electrical engineering, IT, basic TCP/IP principles, and M-Bus systems.
The GE552Y051 has an embedded webserver and is a datalogging and consumption monitoring system for
heating and cooling systems equipped with meters that communicate using the M-Bus and wireless M-Bus
868MHz protocol.
Please read carefully the following notes
•
Place the system Firewall undercovered and isolate it from the corporate network
•
For remote access to the machine, we recommend the use of secure technologies such as Virtual
Private Networks (VPNs), recognizing VPN in the most secure way to connect to the device
The first section of this guide is dedicated to the description of the technical specifications of the
GE552Y051 and its commissioning. We will describe how to commission the plant, scanning and adding
meters. Then, we will describe the advanced configuration via web interface and, finally, how to generate
consumption reports and plans.
1.1.2
Content of the packaging
The GE552Y051 packaging contains:
•
GE552Y051 datalogger
•
Installation leaflet