UNIT ASSEMBLY
MODEL 2000
Your Giant-Vac Model 2000 PTO Blower comes fully assembled * and ready for
installation onto your tractor. (Follow the manufacturer’s instructions for proper
connection to the tractor.)
*
The only assembly step required is the installation of the inner deflector door control
rod:
•
Remove 1/2” lock nut from threaded stud end of control rod.
•
Slide rod end through hole in control rod holder (the long angle piece with the large
hole on top, extending upward from the blower frame assembly).
•
Insert threaded stud end of rod down through hole in inner deflector door control arm
and replace lock nut, tightening just enough to allow free, but not sloppy, movement
of rod.
MODELS 3200-4000
PRE-ASSEMBLY:
•
Identify the following items inside the components box:
2 – Caster wheel assemblies
2 – Lower hitch point assemblies
2 – Support legs
1 – Top hitch point
1 – Hardware package
INSTALLING THE CASTER ASSEMBLIES:
•
Remove the ½” x 1-1/4” bolt (Parts list ref. #24) and washers (#21-23) from the top of
each of the two caster assemblies. Also remove red caster spacers, but leave thrust
bearing (#18) in place.
•
Slide top section of each caster assembly up through caster arm sleeves, replace
spacers, then secure with same hardware removed in previous step.
•
Carefully tilt unit onto side so that caster wheels contact ground, then remove metal
skid.
Note: Assistance is recommended, as weight of unit can cause serious
injury.
2