GVTP GM32-R0103.1
3
unit assembly (cont.)
TRANSMISSION SHIFT LEVER ASSEMBLY (cont.)
•
Position ‘double-D’ hole in bottom leg of shift
lever onto transmission stud, then slowly move
handle of shifter back and forth until hole drops
onto matching base of stud.
•
Replace washer and nut onto transmission
stud. Tighten securely. Replace lock nut onto
1/2” bolt. Tighten snugly while allowing for
shifter movement.
•
Work shift lever through gear range, adjusting
indicator panel for display alignment, then
tighten indicator panel hardware.
FUEL TANK ASSEMBLY
•
Install fuel tank mount brackets (2:56 – right
side shown) onto engine deck using four 5/16 x
¾
” hex bolts, flat washers, lock washers and
nuts (2:57-60). Do not tighten.
•
Place rubber pads (2:61) on top of mount
brackets.
•
Place fuel tank (2:65) on top of rubber pads.
•
Slip fuel tank straps (2:62) around ends of tank,
making sure bottom of straps slip under top
ends of mounting brackets and into notches.
Secure each strap with one 1/4 x 1-1/2” hex
bolt and lock nut (2:63-64). Tighten both strap
and mounting bracket hardware securely.
•
Slip end of fuel line from engine fully onto
barbed nipple of fuel shut-off valve (located
under tank), securing with supplied spring
clamp.