background image

PIAZZETTA Unterfloor distributor system

 

 

Page 1 / 14 

Created 

01.01.2015 

ando 

Modified 

21.01.2021 

roen 

Object-ID 

1874176 

PIAZZETTA Unterfloor distributor system  

Manual 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

VERSION 

MODIFICATIONS 

1.0 

First Edition

 

1.1 

Editorial changes 

1.2 

Editorial 

changes / Format standardisation

 

  

 

 

 

Summary of Contents for PIAZZETTA

Page 1: ...ystem Page 1 14 Created 01 01 2015 ando Modified 21 01 2021 roen Object ID 1874176 PIAZZETTA Unterfloor distributor system Manual VERSION MODIFICATIONS 1 0 First Edition 1 1 Editorial changes 1 2 Editorial changes Format standardisation ...

Page 2: ...roduct features 4 2 3 Scope of delivery 4 2 4 Storage 4 2 5 Disposal of the device 4 3 Assembly and installation 5 3 1 Work tob e done on site by customer 5 3 2 Principle drawing 6 3 3 Einbau PIAZZETTA 7 3 4 Connecting underfloor distributor to power supply 11 4 Maintenance 12 4 1 Inspection and maintenance schedule 12 4 2 Description of maintenance and inspection works 12 5 Debugging 13 5 1 Measu...

Page 3: ...he manufacturer rejects any liability for damage which has been caused by incorrect or non intended use of the product In countries which do not belong to the European Community the national legal reference regulations as well as the standards and regulations applicable in these countries have to be observed for warranty of a corresponding safety level The installation has to be carried out accord...

Page 4: ...ny time Adjustable step protection plates offer protection against stumbling and dirt deposits in the pit when open The junction box is adapted to the connected loads an should be placed on a prepared support A standard concrete tube can be used Top frame and pit cover for special GIFAS construction Dimension depth lid strength and electrical installation equipment depend on customer s requests 2 ...

Page 5: ...d standards compliant installation must be per formed by the customer It is important to ensure that the load capacity of the foundation and or the cover layer corresponds to the load capacity of the underfloor distributor system in order to prevent subsidence Delivery of concrete pipe has to be done on site by the customer If the Underfloor distributor system is to be used immediately after the e...

Page 6: ...roper installation can be found on the project specific drawing from GIFAS Custom models may vary from the following drawings The cover opens automatically through the use of gas springs They support muscular force and allow for the controlled opening and closing of the cover cover heating thermostat covering top edge concrete concrete tube by customer square lock 12 mm ...

Page 7: ...stallation Grinding an opening for the main supply cable Place the concrete tube in the pit level out and fix with mortar concrete Position the top frame and level out at the correct mounting depth level of the asphalt Pack the concrete tube and the frame with the requisite material and set in concrete The PIAZZETTA is delivered upside down Do not set up the PIAZZETTA via the equipped socket sides...

Page 8: ...unction box on the ground beside the frame and insert the main supply cable as far as possible so that the loop in the pit is as short as possible Then connect the cable and screw up the cover not required for direct connection Secure the connecting cable from the junction box on the PIAZZETTA to prevent it from sliding back into the pit Lower the junction box into the pit as shown in the picture ...

Page 9: ...unction box brackets The cable inlet from the electrical distributor box must be located on the opposite side of the junction box This provides space for the cable loop under the PIAZZETTA from the junction box to the electrical distributor box Carefully lower the PIAZZETTA after alignment Insert the main supply cable in the distribution box and connect Caution Use a short cable so that it does no...

Page 10: ... protection plates flush with a spacer ring and tighten up Depending on whether components are fitted on one or both sides push the cable cover plate s flush against the electrical distributor box at the bottom and tighten up with two M6x12 hexagon screws spring washers and washers Step on the middle of the PIAZZETTA and move it down with your body weight Screw up the central screw with a pentagon...

Page 11: ...stem must be cleaned immediately after being grouted into its surroundings Cleaning is also required if the grout has to be renewed 3 4 Connecting underfloor distributor to power supply Hint In the case of underfloor distributor systems with fresh water the junction box must be attached to the side facing away from the water tap point Caution The electrical connection may only be made by trained p...

Page 12: ...gulations Caution Gasdruckfedern sind Verschleissteile und müssen bei Druckverlust umgehend ausgetauscht werden um ein sicheres und langsames Schliessen des Deckels zu gewährleisten 4 2 Description of maintenance and inspection works Lock system lid hinge bar and gas springs need to be checked cleaned and where necessary to be greased in appropriated intervals The lid surface needs to be cleaned f...

Page 13: ...spring failure Replace gas spring Cover can hardly be opened Dirty gas spring Clean the gas spring Cover closes too fast Gasdruckfeder defekt Replace the gas spring Cover will not close Cover surface dirty Clean the cover surface Cover will not close Lock failure Clean change the lock Cover jiggles Loose screws Tightes the screws Earth leakage circuit breaker is trig gering Electrical fault Repair...

Page 14: ...ndorf CH 9424 Rheineck 49 2137 105 0 39 58 497 82 11 43 6225 7191 0 41 71 886 44 44 49 2137 105 230 39 58 493 99 24 43 6225 7191 561 41 71 886 44 49 www gifas de www gifas it www gifas at www gifas ch verkauf gifas de info gifas it verkauf gifas at info gifas ch 6 2 Imprint GIFAS ELECTRIC GmbH CH 9424 Rheineck www gifas ch Technical changes and errors reserved These installation instructions are t...

Reviews: