System Hardware Installation
- 36 -
3-7-2 OCP 2.0
Follow these instructions to install an OCP 2.0 mezzanine card:
1. Loosen the thumbscrew on the riser bracket
2. Lift up the riser bracket out of system.
3. Remove the screw securing the mezzanine card slot cover.
4. Remove the slot cover from the system..
5.
Insert the OCP 2.0 mezzanine card into the compartment ensuring that the card is firmly connected
to the connector on the motherboad.
6. Secure the OCP 2.0 mezzanine card into the system with three screws.
7. Reverse steps 5-6 to replace the OCP 2.0 mezzanine card.
1
2
5
6
4
3
Summary of Contents for R182-Z93
Page 1: ...R182 Z93 AMD EPYC 7003 DP Server System 1U 10 Bay Gen4 NVMe User Manual Rev 1 0 ...
Page 10: ... 10 This page left intentionally blankThis ...
Page 16: ... 16 Hardware Installation 1 3 System Block Diagram ...
Page 42: ...System Hardware Installation 42 NVMe Card 4 5 NVMe Card 6 7 Top Bo om Bo om Top R182 Z92 ...
Page 43: ... 43 System Hardware Installation NVMe Card 8 9 HDD Backplane Board Signal R182 Z92 ...
Page 44: ...System Hardware Installation 44 HDD Backplane Board Power Front Panel IO R182 Z92 ...
Page 45: ... 45 System Hardware Installation Front Panel USB ...
Page 46: ...System Hardware Installation 46 This page intentionally left blank ...
Page 50: ...Motherboard Components 50 This page left intentionally blankThis ...
Page 56: ...BIOS Setup 66 When Boot Mode Select is set to Legacy in the Boot Boot Mode Select section ...
Page 61: ... 71 BIOS Setup 5 2 4 1 Serial Port 1 2 Configuration ...
Page 69: ... 79 BIOS Setup 5 2 8 PCI Subsystem Settings ...
Page 80: ...BIOS Setup 90 5 2 17 Intel R I350 Gigabit Network Connection ...
Page 144: ...BIOS Setup 154 This page intentionally left blank ...