background image

 

 

Capricorn Pro 4 Installation Note 

 

DCP0000264(A)

 

  

 

This installation note is applicable for SkyEdge II-c Capricorn Pro 4 DC series: 

 

To install the SkyEdge II-c Capricorn Pro 4 CPE, the installer must:  

 

Be trained in installing the SkyEdge II-c Capricorn Pro 4 CPE 

 

Be familiar with the SkyEdge II-c CPE Installation Manual (DC-103322-X) 

 

Have the CPE configuration parameters available

 

 

The SkyEdge II-c Capricorn Pro 4 CPE is designed to be installed on a shelf in a 19-inch rack, secured to the cabinet 
by the rack mount ears.  
The CPE can be installed with either front or rear panel facing forward. By default, the CPE is supplied with rack-
mount front ears secured to the front panel. The installation kit includes an additional pair of rack-mount back ears for 
securing to the CPE rear panel to install the CPE with the rear panel facing forward. 
The CPE may contain a built-in DC Inserter.  
 

Unpacking Guidelines 

1.

 

Unpack the Capricorn Pro 4 CPE unit and its accessories. 

2.

 

Compare with the supplied BOM and verify that all the items are supplied in good condition.

 

 

 

C

AUTION

 

 

T

HE 

CPE

  MUST  BE  GROUNDED  PRIOR  TO  INSTALLATION  BY  ATTACHING  ONE  END  OF  THE  GROUNDING 

CABLE  TO  THE  GROUNDING  STUD  ON  THE  REAR  OF  THE 

CPE,

  AND  THE  OTHER  END  TO  THE  SITE  MAIN 

GROUND CONNECTION

.

 

18AWG

 GROUNDING CABLE SHOULD BE USED

 

T

HE 

CPE

 MUST BE CONFIGURED PRIOR TO ATTACHING THE 

RF

 CABLES

 

T

HE POWER CABLE MUST BE DISCONNECTED FROM THE 

CPE

 PRIOR TO CONNECTING THE 

RF

 CABLES

.

 

 

 

 

General Precautions 

 

Do not block the ventilation openings of the CPE or place any object on top of the CPE. 

 

Do not place the CPE in a location that would deviate from typical ambient environmental conditions of 
temperature, humidity, and moisture. 

 

  

 

Warning 

B

EFORE INSTALLING THE UNIT

,

 VERIFY THAT THE ANTENNA IS GROUNDED TO PROVIDE PROTECTION AGAINST 

VOLTAGE SURGES AND STATIC CHARGES

S

ECTION 

810

 OF THE 

US

 

N

ATIONAL 

E

LECTRICAL 

C

ODE

,

 

ANSI/NFPA

 

70,

 AND 

S

ECTION 

54

 OF THE 

C

ANADIAN 

E

LECTRICAL 

C

ODE PROVIDE INFORMATION WITH REGARD TO PROPER GROUNDING OF THE MAST AND 

SUPPORTING STRUCTURE

,

 GROUNDING OF THE LEAD

-

IN WIRE TO AN ANTENNA DISCHARGE UNIT

,

 SIZE OF 

GROUNDING CONDUCTORS

,

 LOCATION OF ANTENNA DISCHARGE UNIT

,

 CONNECTION TO GROUNDING 

ELECTRODES AND REQUIREMENTS FOR THE GROUNDING ELECTRODE

.

 

 

Setting the SEII-c CAPRICORN PRO Output Voltage 

1.

 

Select the power according to the BUC you intend to use before connecting the power to the VSAT. 

2.

 

The VSAT's default output voltage setting is 24V. The output voltage test must be performed (step 4). 

3.

 

Using a flat screwdriver, set the right-side output voltage to 

48

V, and the left side output voltage to 

24

V. 

4.

 

Turn on the VSAT and verify that the LED that signals the output voltage is the selected 24V or 48V 

5.

 

Turn off the VSAT and start the installation 

 

  

 

Warning 

P

LEASE NOTE THAT SETTING THE VOLTAGE TO A DIFFERENT SETTING WILL CAUSE CRITICAL 

DAMAGE TO THE 

O

UT 

D

OOR 

U

NIT

.

 

 

 

Connecting the Grounding Cable 

Connect the grounding cable (GND) from the CPE to the approved site.  
 

Reviews: