Installation
Page 20
MDE-4133B Power Supply Kit M00016K003 Installation Manual • November 2003
18
Make the remaining connections per
Figure 15: Valve Converter Board (M02044)
19
Inspect the dispenser for missing connections prior to power up.
Completing Installation
After the Power Supply Assembly has been installed, perform the following steps.
1
Verify that all newly installed cables and wires are properly dressed and do not obstruct main
door and CIM Door closure.
2
Restore unit power. Observe that the CR17 and CR18 on Power Supply Board M02774
(
or
) are lit.
3
Close and secure all doors.
4
Perform a short sale to verify the dispenser is working properly.
5
Clean up the work site, removing all materials to be discarded and all tools.
Table 1: Remaining Connections
Connector#
via Cable
to Board
at Connector#
J605
(see
and
n/a
n/a
P605
(N21120-GXX)
(see
J606
(see
M02774A001 (Universal Power Supply
Board)
P606
(see
J607
(see
M02774A001 (Universal Power Supply
Board)
P607
(see
J1200
(see
M02044 (Valve Converter Board) - used
with the Proportional Control Valve
P1200
(see
J550 & 3-pin to black wire
adapter
(see
and
)
M02954A001 M00047 (STP Board)
STP feed
(see
Varistor Cable
(M02951A00X) (see
n/a
n/a
Varistor Connector
(M01589A001)
P1200 connector