Installation
MetPak Base Station User Manual
Last Change
©
Gill Instruments Ltd
22 April, 2013
Page 9
Continue to insert all of the contacts you require. Once all of the contacts are
inserted squeeze the 2 red retainers (See Arrows A on previous page) into place.
NB. The retainer can only be pushed back into place if the contacts are fully
engaged.
Fit the connector to the WindSonic Sensor so that you can finish assembling the
connector.
Screw the back shell onto the connector until it is fully in place. Please note that
the final rotations can be slightly stiff.
Now screw the next part of the connector into place.
Now screw the cable-clamping nut into place.
The connector can now be removed from the WindSonic.
NOTE: To disassemble the connector, reverse this procedure.