Installation
MetPak Base Station User Manual
Last Change
©
Gill Instruments Ltd
22 April, 2013
Page 11
WindSonic M (Heated) RS422 10 Metre Cable Connections to
the Heater Power Interface Box.
Note
: See also the lid of the Heater Power Interface Box for Connection Details.
Cut off the contact pins connected to the MetPak Base Station 10 Metre cable,
strip and solder wires. Connect wires to the Heater Power Interface box as follows:-
WindObserver 70 (Enhanced Heated) RS422 10 Metre Cable
Connections to the Heater Power Interface Box.
Note
: See also the lid of the Heater Power Interface Box for Connection Details.
Cut off the contact pins connected to the MetPak Base Station 10 Metre cable,
strip and solder wires. Connect wires to the Heater Power Interface box as follows:-
Remote Base
Station
Heater Power
Interface Box
WindObserver 70
(Enhanced Heated)
10 Metre Cable
8 Way Terminal Block
19 Way Connector
White/Green
8 or Screen Terminal Tag
Cable Screen/Drain wires
Green/White
7
M
Orange/White
6
R
White/Orange
5
D
Brown/White
4
P
White/Brown
3
C
Blue/White
2
U
White/Blue
1
V
No Connection
No Connection
A, E and H
No Connection
No Connection
B, F and G
Heater Power
Supply
Heater Power
Interface Box
WindObserver 70
(Enhanced Heated)
4 Way Terminal Block
19 Way Connector
Heater ve
3
A, E and H
Heater Supply -ve
2
B, F and G
Remote Base Station
Heater Power
Interface Box
WindSonic M
(Heated)
10 Metre Cable
8 Way Terminal Block
9 Way Connector
White/Green
8
1
Green/White
7
No Connection
Orange/White
6
2
White/Orange
5
3
Brown/White
4
4
White/Brown
3
5
Blue/White
2
6
White/Blue
1
7
No Connection
No Connection
8
No Connection
No Connection
9
Heater Power Supply
Heater Power
Interface Box
WindSonic M
(Heated)
4 Way Terminal Block
9 Way Connector
Heater ve
3
8
Heater Supply -ve
2
9