Contents
MetPak RG User Manual
Last Change
©
Gill Instruments Ltd
12 February, 2013
Page 15
Figure 11
Correct Mounting Position for MetPak RG
Note that the mounting pipe should first be degreased and when assembling the
MetPak clamp assembly the outer clamp nuts need to be tightened evenly to a
torque figure of 3 Nm.
The moving plate part of the clamp needs to be reversed for poles below 38 mm
diameter.
Suitable Pole Diameter 30mm to 58mm (1.2 to 2.3 inches).