Pg 14 of 34
www.HOMEDEPOT.com IS2038
9. Plumbing installation
NOTE:
Keep connections loose until all
drain components are aligned, then
tighten securely by hand.
NOTE:
Plumbing should be done by a qualified plumber and in accordance with National
and Local Plumbing Codes.
NOTE:
Tapered side down
A
19-A
18-A
19-C
19-B
20-E
Preparation:
Slip nut (19-C) onto trap-arm (19-A). Position two nuts (18-B and 20-F) and tapered washer (18-C) onto
tailpiece (18-A). Slip tailpiece (18-A) into J-bend (19-B). Slip tapered washer (18-C) down tailpiece (18-A) and fasten using nut (18-B).
Insert trap-arm (19-A) into J-bend (19-B) and hand tighten all nuts. Holding plumbing assembly in the desired position, measure
trap-arm (19-A) and tailpiece (18-A), to required length. Remove trap-arm (19-A) and tailpiece (18-A) and cut with a
hacksaw.
NOTE:
Cut untapered end of tailpiece (18-B) and trap-arm (18-A).
NOTE: Be sure to remove burrs with a file or
sandpaper.
Installing new plumbing:
Loosely connect trap-arm (19-A) and tailpiece (18-A) to J-bend (19-B). Fasten trap-arm (19-A)
to existing waste drain and tighten using existing hardware. Using T-washer (20-E) from strainer kit (20), place it on top of tail-
piece (18-A). Fasten tailpiece (18-A) to tub (A) using nut (20-F).
NOTE: DO NOT OVERTIGHTEN.
18-C
18-B
20-F