Never leave machine unattended while system power
is on or system is running.
System running is defined as: preheat cycle of the hose
heat, primary heaters, or any pump operation.
Machine operators must be familiar with the
component functions and operation of the machine.
Pre-Operation Check List
A.
Check that all fittings are securely tight.
B.
Check electrical hook-up (qualified electrician
recommended).
C.
Main power switch on Control Box should be
switched to
OFF
position.
D.
Air Regulator turned (counter clock-wise) to
OFF
position.
E.
Hose Control and Primary Heater Control to
OFF
position.
Do not place any part of the body in the path of the
material spray.
Do not point the gun at or near other personnel.
Do not look into the Mixing Chamber orifice at any time.
Because of the hazardous materials used in this
equipment, it is recommended that the operator use
an air mask, goggles, protective clothing, and other
safety equipment as prescribed by current regulations,
recommendations of the chemical suppliers, and the
laws in the area where the equipment is being used.
Initial Start-Up Procedure
With all material and air lines connected and power
cable attached, the system is now ready for start-up.
Filling The System
1.
Adjust Air Regulator to 20 PSI to fill system. Air
Motor will cycle slowly to fill Pumps, Heaters and
Hoses and stop.
2.
Remove ISO & POLY side blocks from gun.
PROBLER P2
MAKE SURE VALVES ARE OFF
Section 2 - Operation: Start-Up Instructions
1
Summary of Contents for GUARDIAN A6-6000
Page 25: ...23 REVISION E Section 3 General Information Assembly Drawings 23675 XX Unit Assembly...
Page 26: ...24 REVISION E Section 3 General Information Assembly Drawings 23675 XX Unit Assembly...
Page 32: ...Section 3 General Information Sub Assembly Drawings 30 REVISION D 23450 XX Hybrid Assembly...