15
GC-1368N
8.
Turn the material air regulator “OFF” (counter-clock
wise).
9.
Switch machine recirculation to “ON”.
10.
Turn the material injection regulator slowly clock-
wise until gauge indicates 10 PSI or until pump
cycles slowly.
11.
The pump should cycle clean solvent through the
system and out the recirculation hose.
12.
End recirculation when solvent appears reason-
ably clean. “OFF”
13.
Remove material pump pick-up tube from solvent
container and dry thoroughly.
14.
Switch machine recirculation to “ON”.
15.
When solvent has stopped exiting the recirculation
hose, end recirculation. (OFF)
16.
Place material pick-up tube in desired container of
material while keeping recirculation return hose in
hose in a waste container.
Start-Up
Summary of Contents for Spartan 3
Page 12: ...12 GC 1368N 4 Push for set up screen Start Up ...
Page 26: ...26 GC 1368N REVISION A 23280 02 SPARTAN 3 ASSEMBLY 01 Assembly Drawings ...
Page 27: ...27 GC 1368N REVISION A 23280 02 SPARTAN 3 ASSEMBLY Assembly Drawings ...
Page 28: ...28 GC 1368N REVISION A 23280 02 SPARTAN 3 ASSEMBLY Assembly Drawings ...
Page 30: ...30 GC 1368N REVISION J 23250 00 SPARTAN 3 CONTROL BOX ASSEMBLY Sub Assembly Drawings ...
Page 31: ...31 GC 1368N REVISION J 23250 00 SPARTAN 3 CONTROL BOX ASSEMBLY Sub Assembly Drawings ...
Page 32: ...32 GC 1368N REVISION J 23250 00 SPARTAN 3 CONTROL BOX ASSEMBLY Sub Assembly Drawings ...
Page 35: ...35 GC 1368N REVISION J 23250 00 SPARTAN CONTROL BOX SCHEMATIC Sub Assembly Drawings ...
Page 43: ...43 GC 1368N REVISION P 23280 00 SPARTAN 3 W PAC ASSEMBLY 01 Accessories ...
Page 44: ...44 GC 1368N REVISION P 23280 00 SPARTAN 3 W PAC ASSEMBLY Accessories ...