11
DO NOT
sling across the door threshold.
BEACON & WARRIOR
Position the slings at each end of the Building
approximately 250mm from the corners.
Cut-outs
Tie-back
rope with
protective
packing
Timber spreader beams
5 Handling and Moving Your Product
10
To prevent damaging your Glasdon Building whilst moving and handling, please follow these
guidelines. If you are unsure about any aspect please contact our Transport Department and we will
be delighted to assist.
General Principles
E 6A,C=?=016,>-06>8C698=6482=
E 6A,C=60>>30=6482=>,50>3069,/
E '=0:<9>0.>4@0:,.5482-0>A008>30=6482=,8/
product, where appropriate, to prevent damage.
E 6A,C=>40-,.5>30=6482=A4>3.,<0
E 6A,C=:,/>30>40-,.5<9:0=>9:<0@08>
damaging your product.
E 6A,C=641>=69A6C.,<01?66C,8/=,106C
E
DO NOT USE CHAINS OR ROPES TO LIFT.
E
DO NOT RUSH ANY PART OF THE LIFT.
E
IF IN DOUBT PLEASE ASK.
Building sizes of 3.66 x 2.44m and above
Building sizes up to 3.66 x 2.44m
Position the slings at each corner of the
Building on the underside of the panel base
perimeter radius.
Position the slings at each corner of the Building
on the underside of the panel base perimeter.
Position the slings in the cut-outs provided
in the timber base plinth.
OLYMPIC
Timber spreader beams
BOXER
RIGHT
WRONG
Tie-back ropes
around end
elevations to
prevent slings
slipping inwards
250
Tie-back rope
around side
elevation to
prevent slings
slipping
outwards
Sling
Sling
Protective
packer
Protective
packer
Tie-back rope
around side
elevation to
prevent slings
slipping outwards
Sling
Protective
packer
To allow slings to be released easily
after the lift, always lower the
Building on to temporary wedges.
Temporary
wedge
/ GENESIS