background image

Remove the Internal Cradle by 

pulling it out of the Sack 

Retention Slots in the Bin Body. 

Remove the Liquid Reservoir 
(ITEM 6) by lifting upwards, 
pulling them out of  the Internal 
Cradle. 

Release each sack individually
from the bin rim and lift 
upwards out of the Bin Body.
Return the Cradle to the centre.

Remove the Cup Stacking 
Tubes (ITEM 5) by lifting 
upwards, pulling them out of 
the Internal Cradle.

Rotate the Cup Stacking Tubes 
180 degrees to allow the stacks 
of cups to be removed. 

Open the lid, move the Cradle 
(ITEM 4) across to one side  

2 of 4

EMPTYING THE ECO NEXUS CUP RECYCLING STATION

4.

5.

6.

7.

8.

9.

With bin body upside down, 
click screw and wheel into 
moulded slot. Repeat with 
second wheel.

Push both socket caps
into the moulded recesses
opposite wheels.

From kit provided, place 1 screw 
through a wheel.

ATTACHING THE WHEELS

10.

11.

12.

Reviews: