Remove the Internal Cradle by
pulling it out of the Sack
Retention Slots in the Bin Body.
Remove the Liquid Reservoir
(ITEM 6) by lifting upwards,
pulling them out of the Internal
Cradle.
Release each sack individually
from the bin rim and lift
upwards out of the Bin Body.
Return the Cradle to the centre.
Remove the Cup Stacking
Tubes (ITEM 5) by lifting
upwards, pulling them out of
the Internal Cradle.
Rotate the Cup Stacking Tubes
180 degrees to allow the stacks
of cups to be removed.
Open the lid, move the Cradle
(ITEM 4) across to one side
2 of 4
EMPTYING THE ECO NEXUS CUP RECYCLING STATION
4.
5.
6.
7.
8.
9.
With bin body upside down,
click screw and wheel into
moulded slot. Repeat with
second wheel.
Push both socket caps
into the moulded recesses
opposite wheels.
From kit provided, place 1 screw
through a wheel.
ATTACHING THE WHEELS
10.
11.
12.