nstaLLation

6. cOnnectIOn Of cO2 cylInDers

   

  •  Mount the regulator assembly conveniently near the  

  product supply and CO2 cylinder.

  •  Use either a regulator with a wall mounting bracket or  

  mount directly to the cylinder.

  •  An extension tube is mounted to the carbonator tank  

  with 1/4” barb fitting for ease of connection.  Measure  

  and cut a length of 1/4” I.D. braided flexible tubing to  

  go from the CO2 regulator to the carbonator extension  

  tube (labeled C02).  (Leave enough line to go through  

  the top cover of the unit.)  

  •  Measure and cut 1/4” I.D. braided flexible tubing for  

  each syrup gas line.  Connect one end to the regulator  

  manifold and the other end to syrup supply.

7. start-uP Of DIsPensIng systeM

 

  • 

Open main water supply valve.  

 

   

    Purge air from carbonator by lifting relief valve. 

     

  •  Turn on “CARB” switch. (see fig. 3)

  •  Close all CO2 regulators.

  •  Open the valve on the CO2 cylinder.  (The high pres 

  sure gauge will read about 800 P.S.I.)

  •  Adjust the carbonator regulator to 100 P.S.I.

  •  Operate a valve until carbonated water flows freely  

  (without spurting).

  •  Adjust the syrup regulator to 50 P.S.I.

     

 

 

  •  Adjust diet syrup regulator (if used) to 12 P.S.I.

  •  Check all connections for leaks.

     

 

 

  •  Insulate and tape all exposed refrigerated conduit lines. 

   

 

 

  •  After refrigeration systems has cycled off once, turn on  

  recirculating switch.  (Full ice bank is required to cool  

  tower.)  Replace top cover. 

 

     

 

 

 

 

 

  •  Follow standard brixing procedures.

8. InsulateD cOnDuIt

 

(Figure 5)

 

  •  The GLASTENDER TEMPLOCK insulated tube con- 

  duit is recommended for this remote Post-Mix applica- 

  tion. This manufactured conduit maximizes the cooling  

  performance of the system.

 

  •  Conduit may be run under floors, over ceilings, under  

  the counter or bar, and will not kink in an 18-inch radius  

  around a corner.

    

  •  When conduit is to be run across ceilings or under coun 

  ters, always place conduit straps every 3-ft. to prevent  

  sagging.

  •  On runs through ceilings that are also used for air con- 

  ditioning return ducts, check local fire codes.  They may  

  require that the conduit be covered with a fire rated  

  metal flex duct.

  •  It is recommended that the chase protrude above the  

  floor level a minimum of 2 inches and should be sealed  

  off once the installation has been completed.  By sealing  

  off the floor chase, you eliminate the possibility of for- 

  eign matter being spilled into it, which could permeate  

  the conduit.

fig. 5

   GLASTENDER TEMPLOCK Insulated Conduit

Summary of Contents for LC84

Page 1: ...ichigan Road Saginaw MI 48604 9780 800 748 0423 989 752 4275 Fax 800 838 0888 989 752 4444 www glastender com Operation Manual and Parts Directory LC84 Conquest Post Mix Remote Soda Line Chiller 2006...

Page 2: ......

Page 3: ...Cleaning Hints 4 Water Bath Cleaning and Maintenance 4 Sanitizing Water Circuits 4 Sanitizing Syrup Circuits 4 Preventative Maintenance Schedule 5 Trouble shooting procedures Poor Carbonation 6 Bad T...

Page 4: ...ional 6 legs must be installed to the cabinet bottom If unit is installed on a countertop or shelf a the cabinet must be sealed to the countertop or shelf with an NSF listed silicon RTV applied around...

Page 5: ...standard equipment Before connecting water supply drain approximately two gallons of water from supply to flush out foreign matter It is recommended that a water filtering systems be installed to red...

Page 6: ...reely without spurting Adjust the syrup regulator to 50 P S I Adjust diet syrup regulator if used to 12 P S I Check all connections for leaks Insulate and tape all exposed refrigerated conduit lines A...

Page 7: ...nd pump deck Clean coils and inside of tank with soap or detergent and rinse with water Replace motor and pump deck Replace refrigeration deck Plug cord from refrigeration deck back into control box R...

Page 8: ...ice Weekly Dispensing Follow Standard Brixing Tower Brix Instructions Check Weekly Remote Cooler Wash With Mild Detergent And Wipe Dry Weekly System Review Pressure Gauges Pressures For Proper Setting...

Page 9: ...itch With switch in ON fully opened Incoming water supply to unit should be 3 8 I D minimums Be sure pump and pump motor are properly aligned and the clamp is tight Broken vanes in pump requiring pump...

Page 10: ...inks per minute Pull Down 6 9 hours operational Maximum Distance to Dispensers 150 ft 46 m Carbonator Integral cold carbonator Carbonator Pump 100 gph 378 lph Carbonator Motor 1 3 HP 25 kW Circulating...

Page 11: ...for ventilation and servicing Top front sides are one piece and are removable for servicing the compressor 1 625 Air Intake On Off Switch Compressor Area Under cover Exhaust Exhaust Exhaust Exhaust E...

Page 12: ...Road Saginaw MI 48604 9780 800 748 0423 989 752 4275 Fax 800 838 0888 989 752 4444 www glastender com Typical Installation Diagrams Typical Installation Using bag in box syrup system Typical Installat...

Page 13: ...hs from date of factory shipment whichever occurs sooner Glastender Inc will replace any part or assembly found defective under normal use and service Field replacement parts include a warranty of 90...

Page 14: ...5400 North Michigan Road Saginaw MI 48604 9780 800 748 0423 989 752 4275 Fax 800 838 0888 989 752 4444 www glastender com 11 LC84 Compressor and Related Parts 1 2 3 5 4 8 6 7 9 10 11 13 14 15 16 17 1...

Page 15: ...tion pump white set of 2 pieces 9 00 10 09000261 GT 031404 104 exterior power cord 20 00 11 09000412 GT 037112 Carbonator tank 115V 415 00 12 09000479 GT 034114 Relay compressor 20 00 09000480 GT 0312...

Page 16: ......

Reviews: