Page 16
1.0 DESIGN
1.3 SYSTEM DETAILS
Boiler sited above the BoilerMate or with
dipped fl ow and return pipes
An automatic air vent will be required on the
flow adjacent to the boiler and depending
upon the pipe layout an automatic or manual
air vent will also be required on the return
adjacent to the boiler.
The pressure relief (safety valve) must be
located on the fl ow immediately adjacent to
the boiler.
Heating System
Connection of Bathroom Radiator/Towel
- Rail for Summer use
If a pumped circuit is required for a bathroom
radiator/towel rail, the fl ow pipework can be
connected into the 15mm copper blanked
connection provided. We recommend any
radiators/towel rails on this circuit are provided
with T.R.V.’s and that the total heat output of the
radiators/towel rails is not more than the fi gure
quoted in the table on page 5.
The radiators will only get hot when the
boiler is firing and the store is being
heated.
It is important that the fl ow rates through these
radiators is adjusted to the minimum required
at the lockshield valves on the radiators. If this
is not done the performance of the BoilerMate
A-Class SP will be adversely affected.
Heating System
Remote
F & E cistern
Boiler
Expansion
Vessel
AAV
AAV
Boiler
Flow
Boiler
Return
AAV - Automatic air vent
GCV - Gravity check valve
Pressure relief (safety) valve
Filling loop
Pressure gauge
BoilerMate
A-Class SP
2EMOTE
&%CISTERN
%XPANSION
6ESSEL
"OILER
"ATHROOM4OWEL
2ADIATOR
0RESSURERELIEFSAFETY VALVE
&ILLINGLOOP
0RESSUREGAUGE
#(&
#(2
"2
"&
Summary of Contents for BMA 120 SP
Page 44: ...Page 44 ...
Page 45: ...Page 45 BOILERMATE A CLASS SP ...