Page 10
The BoilerMate SP Pre-Plumbed is a hot water only thermal store. It is intended to be
used in conjunction with a sealed primary system. This is generally expected to be a
system boiler; however this product can also be in a central plant or district heating
system. Please check the table opposite for the maximum pressures.
Heat energy is input into the store via the store plate heat exchanger, store pump and
associated pipework which is fitted to the product. The installer must supply all the
other necessary components to feed the boiler side of the store plate heat exchanger.
Domestic hot water is generated instantaneously
by the BoilerMate domestic hot water assembly.
It is supplied to the taps at mains pressure and
at 55°C. See the domestic hot water installation
section for details.
Please see the drawing below for connections,
location size and type.
Standard Equipment
The standard configuration of the BoilerMate SP
Pre-Plumbed is shown opposite. It is supplied
with the following factory fitted equipment:-
1 90 degree elbow - vent (22mm
compression)
2 Domestic hot water PCB box
3 Compression elbow (22mm)
4 Straight isolator (22mm to FF3/4”)
5 System wiring panel
6 Bent isolator - CV fitted (22mm to FF3/4”)
7 Domestic hot water pump (PWM2)
8 Boiler zone valve for store charging
9 Store PHE (insulated) 24 plate
10 Domestic hot water PHE (insulated) 24
plate
11 Auto bypass valve
12 Central heating zone 1
13 Flow sensor and hot water sensor
14 Central heating zone 2
15 Cold water sensor
16 Hot water outlet (22mm compression)
17 Store pump
18 Cold feed (22mm compression)
19 Inline strainer/flow regulator (22mm
compression) mains cold water in
20 Drain valve
21 Central heating boiler return
22 Store control thermostat
23 3kW immersion heater (backup)
24 System pump
25 Boiler flow
26 Bent isolator - CV fitted (22mm to FF3/4”)
Optional Equipment Kits For BMST-SPPP
1. Sealed primary header tank kit (BCK002)
2. Switch Back up conversion 6kW to 3kW
kit (BCK003)
3. Timer kit (BCK004)
4. Sealed system ROBOKIT (BCK005)
5. Pump over run kit (BCK007)
6. DHW scale prevention kit (BCK008)
1
3
4
7
10
13
15
16
18
19
2
6
5
9
8
11
12
14
17
20
21
22 23 24
25 26
SELECTION
BOILERMATE SP PP
Summary of Contents for BOILERMATE OV PP
Page 47: ...Page 47 APPENDIX APPENDIX B ...