Page 2
The Gledhill BoilerMate range complies with the HWA Specification for hot water only
thermal storage products. The principle was developed in conjunction with British Gas.
This product is manufactured under an ISO 9001:2008 Quality System audited by BSI.
Benchmark places responsibilities on both manufacturers and installers. The purpose is to
ensure that customers are provided with the correct equipment for their needs, that it is
installed, commissioned and serviced in accordance with the manufacturers instructions
by competent persons and that it meets the requirements of the appropriate Building
Regulations. The Benchmark Checklist can be used to demonstrate compliance with
Building Regulations and should be provided to the customer for future reference.
Installers are required to carry out installation, commissioning and servicing work in
accordance with the Benchmark Code of Practice which is available from the Heating
and Hot Water Industry Council who manage and promote the Scheme. Visit www.
centralheating.co.uk for more information.
For further information on the HWA Charter Statement, please refer to the HWA website
hotwater.org.uk.
Section
Page
DESIGN
Introduction
3
Model Selection
5
PRODUCT SPECIFICATION
OV PP Components
6
OV PP Technical Specification
7
SP Components
8
SP Technical Specification
9
SP PP Components
10
SP PP Technical Specification
11
TRANSPORTATION
Lifting and Handling
12
INSTALLATION
Domestic Hot Water
13
Central Heating
18
Store Charging
33
COMMISSIONING
Commissioning and checks
35
SERVICING AND MAINTENANCE
Short Parts List
37
Annual Service
38
Changing Components
38
Fault Finding
40
APPENDIX
Appendix A
46
Appendix B
47
Terms & Conditions
48
Benchmark Checklist
50
Benchmark Service Record
51
ISSUE 01: JUNE 2019
Summary of Contents for BOILERMATE OV PP
Page 47: ...Page 47 APPENDIX APPENDIX B ...