Page 36
COMMISSIONING
COMMISSIONING
Important Do’s and Don’ts
1.
DO
check the incoming mains water pressure. The preferred range of mains
pressure is 2 -3 bar.
2.
DO
check the flow rate of the incoming cold water main is adequate to meet the
maximum hot and cold water simultaneous demands.
3.
DO
check that all connections are in accordance with the labelling on the thermal
store.
4.
DO
check the water level is correctly set in the top up cistern when cold and if
fitted that there is no overflow when the appliance is up to temperature.
5.
DO
check that the control thermostats switch the immersion heaters off at the
correct set point i.e. approx 75°C.
6.
DO
insulate any exposed hot water pipework in the BoilerMate cupboard.
7. If the ballvalve in the F & E cistern is permanently connected to the mains cold
water supply
DO
plumb the overflow/warning pipe in a 20mm internal diameter
pipe and ensure it discharges in a conspicuous external position. Use a material
which is suitable for use with heating F & E cisterns in accordance with BS 5449
(such as copper).
8. Once the appliance is filled and commissioned
DO
leave the electricity switched
on to the appliance to ensure the automatic pump run facility can operate to
prevent the pump sticking.
9.
DO
ensure that the functioning and control of the system is explained to the
occupant.
10.
DON’T
place any clothing or other combustible materials against or on top of this
appliance.
Summary of Contents for BOILERMATE OV PP
Page 47: ...Page 47 APPENDIX APPENDIX B ...