background image

Page 30

TERMS AND C

ONDITIONS

Gledhill

 (Building Products) 

Ltd

AMD. JUNE 2008

CONDITIONS OF SALE & GUARANTEE TERMS

1.

Gledhill (Building Products) Ltd (“We” or “Gledhills”) only do business upon the Conditions which appear 

below and no other.  Unless we so agree in writing these Conditions shall apply in full to any supply of goods by us 
to the exclusion of any Conditions or terms sought to be imposed by any purchaser.  These Conditions of Sale and 
Warranty Terms override those which are contained on the Invoice Forms and all Sales are now subject to these 
Conditions of Sale and Warranty terms only.

2.

PRICE

Once an order or call off has been accepted the price will be held for three months 

but if delivery is extended 

beyond that period at the customer’s request, then we reserve the right to amend the price when necessary.

  

The company reviews its pricing annually to adjust for changes in our cost base.  We reserve the right to alter prices 
at any time for severe movements in raw materials (mainly copper and steel).  If there is to be a change we will give 
customers at least four weeks notice but anything delivered after that date will be at the revised price.  An order 
may not be cancelled or varied after acceptance without the written consent of the company.  Such cancellation or 
variation shall be subject to such reasonable charges as may be appropriate.

3.

SPECIFICATION

The goods are supplied in accordance with the Specifications (if any) submitted to the Purchaser and any additions 
and alterations shall be the subject of an extra charge.  Any goods not so specified shall be in accordance with our 
printed literature or the literature of any of our component suppliers (subject to any modifications made since 
publication).  If we adopt any changes in construction or design of the goods, or in the specification printed in our 
literature, the Purchaser shall accept the goods so changed in fulfilment of the order.

4.

PAYMENT

The invoice price of goods shall be payable within 30 days of despatch by us of our invoice for the goods or such 
longer time as may be stated by our quotation or invoice.  If we receive payment in full on or before the due date we 
will allow an appropriate settlement discount except where we have quoted a special net price.  If payment is not 
received in full on or before the due date we shall be entitled in addition to the invoice price to:
(i)

payment of a sum equal to any increase in the copper price supplement applicable to the particular goods 
sold between the date of receipt of order and the date of receipt of payment in full; and 

(ii)

interest on any part of the invoice price unpaid after the due date at the rate of 3% per annum over the base 
rate for the time being of HSBC Bank plc.

5.

TIME

We give estimates of delivery dates in good faith and time of delivery is not nor shall be made of the essence of any 
contract nor shall we be liable for any loss or damage occasioned by delay in delivery.

6.

DELIVERY

We deliver free normally by our own vehicles within 25 miles of any of our manufacturing depots.  Delivery to any 
place more than 25 miles from one of our manufacturing depots may be subject to our quoted delivery charges.  We 
reserve the right to make delivery of goods contained in one order by more than one consignment and at different 
times.  Where a period is agreed for delivery and such period is not extended by our Agreement, the Purchaser shall 
take delivery within that period.    If the Purchaser fails to take delivery, we shall be entitled at the Purchaser’s risk and 
expense to store the goods at the Purchaser’s premises or elsewhere and to demand payment as if they had been 
despatched.  Off loading at point of delivery shall be the responsibility of and be undertaken by the Purchaser.

7.

SHORTAGES OR DAMAGE

Goods must be inspected before signature of delivery note and any damage, shortage or discrepancy noted on the 
delivery note and the goods returned on the same vehicle.  The buyer must also give us immediate written notice of 
the damage, shortage or discrepancy so that we may prompt investigation.

8.

RETURN OF GOODS

Goods may not be returned to the Company except by prior written permission of an authorised officer of the 
Company and such return shall be subject to payment by the Purchaser of handling and re-stocking charges, 
transport and all other costs incurred by the Company.

9.

COMPANY LIABILITY AND GUARANTEE

9.1.

Subject to the terms of these Conditions of Sale and Guarantee Terms Gledhills provide Guarantees in respect 
of specific products as set out in this clause.

9.2.

Each Guarantee is strictly conditional upon the following:-

9.2.1. Complaints must be given to us immediately, before any action is taken, as responsibility cannot be accepted 

if repairs or renewals are attempted on site without our written approval.

9.2.2. The unit has been installed in accordance with our installation and service instructions and all relevant codes 

of practice and regulations in force at the time of installation.

9.2.3. All necessary inlet controls and safety valves have been fitted correctly. 
9.2.4. The unit has only been used for the storage of potable water supplied from the public mains.
9.2.5 Where appropriate the unit has been regularly maintained as detailed in the installation and service 

instructions

9.2.6. Defects caused by corrosion or scale deposits are not covered by any Guarantee.
9.2.7. Where we agree to rectify any defect we reserve the right to undertake the work on our own premises.
9.3.

Guarantees are provided in respect of specified goods supplied by Gledhills as follows:-

(a) Domestic and Commercial Open Vented Cylinders and Tanks.

The copper storage vessel is guaranteed for ten years and if it proves to be defective either in materials or 
workmanship, we will either repair or supply replacement at our option with the closest substitute in the case 
of any obsolete product to any address in Great Britain.
(i)    free of all charge during the first year after delivery by us.
(ii) thereafter at a charge of one-tenth of the then current list price and any copper price supplement and 

delivery charge during the second year after delivery by us and increasing by a further one-tenth on the 
second and subsequent anniversary of delivery by us.

(b) Domestic Mains Fed Products [Primary Stores]

The copper storage vessel is guaranteed for five years and if it or any integral pipework as part of the storage 
vessel assembly proves to be defective either in materials or workmanship, we reserve the right to either 
repair or supply replacements or the closest possible substitute in the case of any obsolete product and will 
collect and deliver to any address in England, Wales and Scotland (excluding all Scottish Islands).
(i) free of all charge during the first year after delivery by us.
(ii) thereafter at a charge of one-fifth of the then current list price or any copper price supplement and 

delivery charge during the second year after delivery by us increasing by a further one-fifth on the second 
and subsequent anniversary of delivery by us.

(c) Integrated Boiler and Storage Vessel Products and Stand Alone Boilers

In the case of the GulfStream range of products and the Gledhill boiler range of products,  Gledhill guarantees 
the heat exchanger (boiler) for material and construction faults for two years.  THE RESPONSIBILITY FOR THE 
EXECUTION OF THIS GUARANTEE LIES WITH THE INSTALLER.
The guarantee becomes null and void if the appliance is used incorrectly, or in the event of proven negligence 
or incorrectly implemented repairs 

OR FAILURE TO CARRY OUT THE RECOMMENDED INSPECTION/

MAINTENANCE

.  The guarantee also becomes null and void if changes are made to the appliance without our 

knowledge, or if the serial number on the appliance is removed or made illegible.

The annual service must be carried out by a competent 
installer in accordance with the advice given by 
Gledhill and using Gledhill approved parts.

(d) Stainless Steel Unvented Cylinders

Gledhill guarantee the components including controls, 
valves and electrical parts for two years from the date 
of purchase.  IT SHOULD BE NOTED THAT THE FACTORY 
FITTED TEMPERATURE AND PRESSURE RELIEF VALVE 
MUST NOT BE REMOVED OR ALTERED IN ANY WAY 
OR THE GUARANTEE WILL NOT BE VALID.  GLEDHILL 
WILL NOT BE RESPONSIBLE FOR ANY CONSEQUENTIAL 
LOSS OR DAMAGE HOWEVER IT IS CAUSED. 
The guarantee for the stainless steel vessel is for 
twenty five years if the original unit is returned to us 
AND PROVIDED THAT:
(i) It has been installed as per the Design, Installation 

& Servicing Instructions, relevant standards, 
regulations and codes of practice.

(ii) It has not been modified, other than by Gledhill.
(iii) It has not been subjected to wrong or improper 

use or left uncared for.

(iv) It has only been used for the storage of potable 

water.

(v) It has not been subjected to frost damage.
(vi) The benchmark log book is completed after each 

annual service.

(vii) The unit has been serviced annually.
It should be noted that the guarantee does not cover:
-

the effects of scale build up

-

any labour charges associated with replacing the 
unit or  parts.

If the stainless steel vessel proves to be defective 
either in materials or workmanship we reserve the 
right to either repair or supply replacements or the 
closest possible substitute in the case of any obsolete 
product and will collect and deliver to any address in 
England, Scotland and Wales (excluding all islands):
(i) free of charge during the first year after delivery by us.
(ii) thereafter at a charge of one twenty fifth of the 

then current list price during the second year 
after delivery by us and increasing by a further 
one twenty fifth on the second and subsequent 
anniversary of delivery by us.

ACTION IN THE EVENT OF FAILURE
If the stainless steel cylinder develops a leak we will 
ask for a deposit against the supply of a new one.  This 
will be refunded if the failure is within the terms of the 
warranty when it has been examined by us.

(e) Solar Panels and ancillary equipment

Gledhill provides a five year warranty for defects in 
the collectors (except broken glass and collector 
accessories eg metal edgings).  If the collector 
demonstrably fails to meet one of the requirements of 
the standard DIN 4757 part 3 we will replace it free of 
charge based on the date of invoice.  We can not be 
responsible for damage caused by mechanical stress 
and/or changes caused by weather related influences.  
The warranty excludes minor surface damage that 
does not affect performance or malfunction due to 
improper assembly or installation.

Please note:

-

Installation must have been carried out by a 
licensed specialized company (heating contractor 
or plumber) following the version of installation 
instructions in force.

-

Gledhill or its representative was given the 
opportunity to check complaints on site 
immediately after any defect occurred.

-

Confirmation exists that the system was 
commissioned properly and  that the system 
was checked and maintenance was performed 
annually by a specialised company licensed for 
this purpose.

(f) Components of our products other than 
Storage Vessels and Integral Pipework.

We will either extend to the purchaser the same terms 
of warranty as we are given by the manufacturer of 
the component or if the manufacturer does not give 
any warranty, replace free of charge any component 
which becomes defective within two years after the 
date of the delivery by us and is returned to us at the 
purchaser’s expense but we shall not meet the cost of 
removal or shipping or return of the component or 
any other cost charges or damages incurred by the 
purchaser.
If the appliance manufactured by Gledhill incorporates 
a factory fitted scale inhibitor then during the period 

Summary of Contents for Stainless Lite Direct 90-300 litres

Page 1: ...300 litres Stainless Lite Solar Direct 180 300 litres Stainless Lite Solar Indirect 180 300 litres An unvented hot water storage unit complying with the requirements of Building Regulations Approved Document G3 and manufactured in accordance with BS EN 12897 the specification for the unvented water storage vessels ...

Page 2: ... at all times to ensure they do not play with the appliance This information is provided to assist generally in the selection of equipment Responsibilityforselectionandspecificationofourequipmentmusthoweverremainthat of our customer and any experts or consultants concerned with the installation s PLEASE NOTE THAT WE DO NOT THEREFORE ACCEPT ANY RESPONSIBILITY FOR MATTERS OF DESIGN SELECTION OR SPEC...

Page 3: ... inlet pressure to Pressure Reducing Valve 12 bar Operating pressure PRV setting 2 2 bar Expansion Relief Valve setting 4 5 bar Maximum primary working pressure 3 5 bar Opening pressure of T P Relief Valve 6 bar Opening temperature of T P Relief Valve 95 C Energy cut out thermostat setting 80 C Immersion heater Rating 3kW 240V AC All cylinders are manufactured in accordance with the requirements o...

Page 4: ...r gains and electricity Figure 3 4 StainlessLiteIndirectSolar Forproviding hotwaterbysolargainsandgasoroilboilers Figure 4 Unvented cylinders must not be used with solid fuel boilers or steam as the energy source Stainless Lite Direct Stainless Lite direct is an electrically heated unvented hot water storage cylinder designed primarily for use with off peak electrical supplies It is supplied fitte...

Page 5: ... 1 on Page 6 7 Stainless Lite Indirect Solar Stainless Lite indirect is an unvented hot water storage cylinder and is provided with a high efficiency internal primary coil which is designed for use with a gas or oil boiler and is suitable for both open vented and sealed pumped primary systems When used with a sealed heating system the boiler must incorporate its own energy cut out overheat thermos...

Page 6: ...3 125 n a D300 37 337 300 2 25 35 2020 550 1777 1577 1077 522 223 155 n a Indirect IND90 19 109 90 2 25 12 732 550 490 n a n a 367 352 n a 367 IND120 22 142 120 2 25 12 920 550 678 n a n a 367 352 n a 367 IND150 26 176 150 2 25 18 1107 550 865 n a n a 442 392 n a 407 IND180 28 208 180 2 25 18 1295 550 1053 n a n a 442 432 n a 447 IND210 33 243 210 2 25 24 1483 550 1241 1127 n a 442 432 n a 482 IND...

Page 7: ...n a n a n a n a n a 299 263 1 93 n a 367 223 312 n a n a n a n a n a 16 5 0 59 0 165 n a n a 21 16 0 80 n a 367 223 312 n a n a n a n a n a 18 0 59 0 165 n a n a 27 19 1 00 n a 407 223 352 n a n a n a n a n a 18 5 0 68 0 191 n a n a 28 19 1 20 n a 447 223 392 n a n a n a n a n a 19 0 78 0 216 n a n a 33 21 1 40 n a 482 223 392 n a n a n a n a n a 20 5 0 78 0 216 n a n a 41 26 1 60 n a 577 223 472 ...

Page 8: ...mperature pressure relief valve 90 6 bar 3 Hot water secondary return 22mm capped not fitted to smaller sizes see table 1 4 Immersion heater 1 BSP 3kW 5 22mm cold supply compression 6 Immersion heater 1 BSP 3kW 7 Dual control overheat stat pocket 22mm 8 Boiler control sensor pocket spare 9 Primary return 22mm 10 Primary flow 22mm Component kit supplied separately A Combination inlet group incorpor...

Page 9: ...ostat Stainless Lite Indirect Solar Basic Appliance 1 Hot water draw off 22mm compression 2 Temperature pressure relief valve 90 6 bar 3 Hot water secondary return 22mm capped not fitted to smaller sizes see table 1 4 Immersion heater 1 BSP 3kW 5 22mm cold supply 6 Thermostat pocket 22mm 7 Primary return 22mm 8 Primary flow 22mm 9 Dual control Overheat stat solar thermostat pocket 10 Solar coil re...

Page 10: ...site are based on a typical days hot water use assuming an Economy 7 tariff is provided A reduction of one model size can normally be made with an Economy 10 tariff When using the Direct models for high specification developments an increase of one model size should be considered Where selecting a solar model it is important to check the dedicated solar volume shown in table 1 on page 7 is suitabl...

Page 11: ...e suitable Shower Fittings Aeratedtapsarerecommendedtopreventsplashing Anytypeofshowermixingvalve can be used as long as both the hot and cold supplies are mains fed However all mains pressure systems are subject to dynamic changes particularly when other hot and cold taps showers are opened and closed which will cause changes in the water temperature at mixed water outlets such as showers For thi...

Page 12: ... to persons in the vicinity of the discharge be of metal and a Be at least one pipe size larger than the nominaloutletsizeofthesafetydeviceunless its total equivalent hydraulic resistance exceeds that of a straight pipe 9m long i e discharge pipes between 9m and 18m equivalent resistance length should be at leasttwosizeslargerthanthenominaloutlet size of the safety device between 18 and 27m at lea...

Page 13: ...argesformsafetydevicesmaynotbeapparenti e indwellingsoccupiedby blind infirmordisabledpeople considerationshouldbegiventotheinstallation of an electronically operated device to warn when discharge takes place Safety ThesafetydevicessuppliedorfittedonanStainlessLiteareselectedfortheirsuitability for the temperatures and pressures involved They must not be changed removed or by passedanditisessentia...

Page 14: ...t be in accordance with the relevant IEE Wiring Regulations and the circuit must be protected by a suitable fuse and a double pole isolating switch The correct method of terminating the wiring to the immersion heater is shown opposite Line Strainer This is integral within the combination inlet group to reduce the likelihood of contaminants fouling the valve seat Following installation this line st...

Page 15: ...llow the wiring diagram in the Wiring Section of these instructions Sealed Primary Circuit Any boiler used must be fitted with an over temperature cut out Unvented primary circuits may be filled or replenished by means of a temporary connection between the circuit and a supply pipe provided a Listed double check valve or some other no less effective backflow prevention device is permanently connec...

Page 16: ...ty of restriction or disclosure by any other fitted component A more detailed diagram of our recommended arrangement for a typical solar system is shown on page 17 This provides all the necessary controls and safety devices necessary for the solar system i e the two port zone valve is wired as an energy cut out and the pump valve will only allow heat transfer as required under control of the Delta...

Page 17: ...Dual Thermostat Gledhill Stainless Lite Unvented Cylinder T Anti Gravity Check Valve Pressure Relief Valve Anti Gravity Check Valve Standard 10 way wiring junction box Not supplied This valve must be fitted on the return to the solar panels and be suitable for higher temperatures operation Not supplied No isolation valve should be installed between the solar circuit and the safety valve pressure r...

Page 18: ...ctrical installation must comply with IEE requirements For electrical installation refer to BS7671 Note Do not attempt the electrical work unless you are competent to carry out to the above standard Blue Bl Brown Br Green Grey Green Yellow G Gr G Y WIRE COLOUR LEGEND Black Orange Yellow White Red B Or Y Wh R Br Bl G Y B Br Br Bl G Y Or Gr Br Bl G Y Br Bl G Y Or Gr Br Bl G Y Or Gr 5 Amps Br Bl G Y ...

Page 19: ...letionofthedisinfectionprocedure Damage caused through a failure to do this adequately will not be covered by the warranty For the above reasons we recommend the use of a non chlorine dased disinfectant such as Fernox LP Sterox as manufactured by Cookson Electronics when carrying out disinfection of systems incorporating these appliances Removethefilterfromthecombinationinletgroupcleanandreplace R...

Page 20: ... the taps a small surge in flow may be experienced which disappears as the pressure in the system stabilises This is quite normal with these types of systems and does not indicate a fault In some areas the water will initially appear cloudy but will quickly clear when left to stand This is nothing to be concerned about and is due to aeration of the water WARNING Ifwaterisseenflowingthroughthetundi...

Page 21: ...n relief valve 4 Check discharge pipes from temperature and expansion relief valves are free from obstruction and blockage and are not passing any water 5 Check the condition and if necessary descale the heat exchangers in hard water areas 6 Check that water pressure downstream of pressure reducing valve is within the manufacturers limits 7 Check operation of motorised valve 8 Check the pressure o...

Page 22: ...is electrical ensure that the immersion heaters are isolated from the mains before re setting the energy cut out If the immersion heater s need replacing this should be done with the units supplied from Gledhill Building Products Limited Same day despatch to approved installers can be arranged by telephoning 01253 474402 Discharge From Relief Valves If cold water is discharging from the expansion ...

Page 23: ...continuity and Re set END YES YES YES NO NO NO FAULT No Hot Water Indirect Switch on Set programmer Re set check wiring plumbing is correct Re set Is all wiring to the controls ok Replace thermostat Re wire START Is boiler on Is hot water programmer in on position Is zone valve in correct position Is control temperature set at 55ºC 60ºC Has high limit cut out Re set END YES YES YES YES YES YES YES...

Page 24: ...m free from restrictions blockages YES NO Is pressure reducing valve in combination valve working FAULT Poor Water Flow at Hot Taps FAULT Water Discharge Into Tundish Clean or replace as required Is expansion vessel charge pressure correct Replace ERV TPRV Replace PRV END START Is pressure downstream of pressure reducing valve correct Is valve seal and seat clean undamaged Is heater operating at l...

Page 25: ...ble hose 1 SG003 6 12 18 litre wall mounting bracket for expansion vessel 1 XG010 7 12 litre expansion vessel 1 XG164 8 18 litre expansion vessel 1 XG009 9 24 litre expansion vessel 1 XG183 10 24 litre wall mounting bracket for expansion vessel 1 XG184 11 35 litre floor standing expansion vessel 1 XG057 12 35 litre wall mounting bracket for expansion vessel 1 XG058 13 22mm 2 port valve indirects o...

Page 26: ...d Stourbridge West Midlands DY8 1PA TELEPHONE 01384 442611 FAX 01384 442612 Water Savings Water Related Costs Can Be Reduced By Good Plumbing Practice TAPS MIXERS SHOWERS Unregulated 25 30 l m Regulated 10 12 l m Over 20 l m 5 6 or 8 l m 2 tap half open Fitted with regulator Unregulated 4 Fixing Options For Taps Mixers 1 MK Range Combined Regulators Aerator forscrewingontoTaps Mixerswithinternal o...

Page 27: ... is supplied with a pallet which has been attached to the unit via the packaging The pallet will also allow for one or two persons to get a good hold e Taking the lead for team lifts As more than one person is required for these products ensure that one person is taking the lead This may be you so ensure that each person that is helping is made aware of the weight and of the items listed within th...

Page 28: ...No CORGI ID CARD SERIAL No COMMENTS SIGNATURE SERVICE 3 DATE ENGINEER NAME COMPANY NAME TEL No CORGI ID CARD SERIAL No COMMENTS SIGNATURE SERVICE 4 DATE ENGINEER NAME COMPANY NAME TEL No CORGI ID CARD SERIAL No COMMENTS SIGNATURE SERVICE 5 DATE ENGINEER NAME COMPANY NAME TEL No CORGI ID CARD SERIAL No COMMENTS SIGNATURE SERVICE 6 DATE ENGINEER NAME COMPANY NAME TEL No CORGI ID CARD SERIAL No COMME...

Page 29: ...Page 29 NOTES ...

Page 30: ...her in materials or workmanship we will either repair or supply replacement at our option with the closest substitute in the case of any obsolete product to any address in Great Britain i free of all charge during the first year after delivery by us ii thereafter at a charge of one tenth of the then current list price and any copper price supplement and delivery charge during the second year after...

Page 31: ...ject to of any other contract between the Purchaser and us which at the time of payment of the full price of the goods sold under this contract have been delivered to the Purchaser but not paid for in full c until property in the goods supplied hereunder passes to the Purchaser in accordance with paragraph 2 above i the Purchaser shall hold the goods in a fiduciary capacity for us and shall store ...

Page 32: ...umstances this booklet which is accurate at the time of printing should be disregarded It is advisable to check the product technical detail by using the latest design and installation manuals available from our technical support team or on our website Issue 09 05 09 Our appliances are distributed through Gledhill Building Products depots at Blackburn Braintree Bristol Dudley Hemel Hempstead Hunti...

Reviews: