background image

 

Global Water 

800-876-1172 

 globalw.com 

 

 

- 4 - 

 

IV.

 

Installing the 4-20mA Weather Station 

 

a.

 

Please refer to Appendix A prior to installing the 4-20mA Weather 
Station to review any optional sensor’s mounting instructions that may 
modify the standard setup. 

b.

 

Each sensor comes equipped with mounting hardware for a 1” 

diameter pipe. 

c.

 

The 4-20mA Weather Station stand consists of a 1” diameter stainless 
steel cross bar with a T fitting and the mast (two 1” diameter tubes 
connected together with a pvc insert).  The top piece of the mast has a 

T fitting with a 1” stub attached also. 

d.

 

Insert the bottom of the mast into a solid base and secure it.  Global 
Water sells a Tripod for this purpose, WE830. 

e.

 

Slide the top of the mast onto the pvc insert to complete the mast. 

f.

 

Mount the cross bar to the top of the mast using the attached T fitting.  
Tighten the set screw with the enclosed allen wrench.  Ensure that the 
cross bar is level.  NOTE: For best results the cross bar should be at 
least 8’ above the ground or roof. 

g.

 

The Wind Speed and Wind Direction sensors should be mounted on 
the opposite ends of the cross bar.  Loosen the set screw holding the 
Wind Direction sensor in the elbow. Line up the notches on the Wind 

Direction Sensor, turn the sensor until the notches face north, and 
secure the sensor.  

h.

 

The Temperature Sensor and Humidity Sensor are pressure fitted 
inside the Solar Shield.  The Solar Shield has a 1” elbow that mounts 

on the stub attached to the top portion of the mast.  Place the elbow 
on the stub and secure with the set screw. 

i.

 

If the mast is in an area of extreme wind it may be necessary to secure 
the 4-20mA Weather Station with guy wires (not included).  

 
 
 
 

 
 

Summary of Contents for WE900

Page 1: ...Global Water 800 876 1172 globalw com 1 Global Water Instrumentation Inc 11257 Coloma Road Gold River CA 95670 T 800 876 1172 Int l 916 638 3429 F 916 638 3270 4 20mA Weather Station WE900 5 28 02...

Page 2: ...E900 to be a valuable asset for your application Should you require assistance our technical staff will be happy to help Table of Contents I Checklist Page 3 II Inspection 3 III Description 3 IV Insta...

Page 3: ...fied by Global Water s Quality Assurance Team before shipping If any damage has occurred during shipping please notify Global Water Instrumentation Inc and file a claim with the carrier involved Use t...

Page 4: ...ert to complete the mast f Mount the cross bar to the top of the mast using the attached T fitting Tighten the set screw with the enclosed allen wrench Ensure that the cross bar is level NOTE For best...

Page 5: ...er to the Weather Sensor manual to determine how often each sensor should have its calibration checked VI Specifications a Refer to the Weather Sensor manual for individual sensor specifications b 4 2...

Page 6: ...equipment needs to be returned to the factory for any reason please call to obtain a RMA Return Material Authorization DO NOT return items without a RMA on the outside of the package Include a writte...

Page 7: ...ption I replacing or II repairing any products determined to be defective In no case shall Global Water s liability exceed the products original purchase price This warranty does not apply to any equi...

Page 8: ...where the sensor will not be shaded by any other sensor of object Tighten the T fitting s set screws with the enclosed allen wrench to secure the stub in place c The Solar Radiation Sensor has a 1 elb...

Reviews: