Commissioning
Check whether finger guard plate (1) is present
and is sitting firm.
Check whether the die set (2) is free from foreign
matter.
Check whether the pneumatic tubing nuts (3)
have been tightened firmly.
Check the compressed-air supply:
min. 4 bar, max. 6 bar filtered air.
Connect the tubing plug-in connector (4) to the
compressed-air supply.
Operation
Introduce stripped wire, with wire-end ferrules
already fitted, at the side (1) in the hole
assigned to the cross-section.
Press the lever (2), the crimping process will be
triggered.
Release the lever (3), the crimped wire can be
removed again (4).
Fig. 2
Putting into operation
Fig. 3
Operation