GBESS 2.4_4.8KWH system user manual
19
SET
Single Energy Meter
L
N
L’
N’
5 6 7 8
GRID
Geatom103KHF System
Figure 23 Mounting Energy Meter
The meter address set inside the inverter can be read from the label on the meter as shown in Figure
24.
L
L
’
N
N
’
5
6
7
8
A
ADL 100 E/C
Single-Phase Energy Meter
800imp/kWh
50/60Hz
GB/T 17215.321-2008
DATE: 06/06/16
220V
B
+
—
1
*99999999999999*
L
N
Lo
ad
RS485
kWh
20(80)A
Address: 001
Figure 24 Meter Address
Warning
Please ensure the grid is disconnected before installation
Caution
The maximum current stand by energy meter is 80A
Caution
A standard AC breaker should be installed after the “GRID” port of
the inverter
Table 7 Warning