S
TEP 3
S
TEP 4
Center the pencil channel along the front
edge of the drafting top. Push the pencil
channel back until it meets the hinge (see
diagram below).
Use #8 x 5/8" screws to attach the pencil
channel to the top.
Pencil Channel
Drafting Top
Hinge
Insert the lower foot assembly into the main tube leg.
(4) places. Set the tube at the desired height and fasten
with (2) 1/4-20 x 1/2” flange head bolts.
Set table in place and adjust levelers as required.
For adjustable height tables.