background image

S

TEP 6

Place the work surface as shown on top of the assembled 
base. The work surface contains threaded inserts to align 
with the provided bypass holes in the legs. Attach the work 
surface to the base using (4) 1/4-20 x 1 1/2 Flange head 
bolts.
If your work station has a front brace use (4) #14x1” Lag 
Bolts to affix the brace to the work surface (all holes may 
not be filled)

1/4-20 x 1- 1/2” Flange Head Bolt

#14X1” Lag Bolt

S

TEP 7

If you ordered the optional CPU Rack we will attach it to the 
leg now. Using (4) 1/4-20 x 1/2” Flange head bolts, attach 
the CPU Rack to the leg as shown. 

Finish by installing the grommets into the holes provided in 
the work surface if you have not already done so.

Reviews: