22
Replacing / repairing the solenoid valve(s) – overload
protector - capacitor (s)
Solenoid Valve
Overload protector
15
17
20
A
16
- Dismount the valve (A) and verify if the same is
damaged. If yes, change it, if not, make its cleaning.
- Disconnect protector’s overload terminals (18);
- Unscrew the fixing nut of the overload protector under the command box (19);
- Remove the overload protector and provide the substitution (20).
IMPORTANT:
After the repair /substitution procedure
of the components, when mounting them again, it is of
extreme importance that it is guaranteed the complete
points sealing, using activator and lock thread glue.
- With the valve solenoid already loose from command box (fig.11 - pag.21), loosen their
electric cables and remove the plastic air hose unscrewing the squeeze nut of the elbow
(15) and (16);
- Unscrew the elbow (17).
19
18
REPAIRS
Summary of Contents for BioQualyAir 40L
Page 1: ......
Page 9: ...9 TECHNICAL SPECIFICATIONS Dimensions mm BioQualyAir 65L BioQualyAir 40L ...
Page 24: ...24 DIAGRAM Connection diagram ...
Page 28: ......