- 16 -
STEP 4
:
Attach the Pedal Tube Assembly
(A) Locate the left and right pedal tube assemblies (#74 and #75)
(B) Attach the front pedal covers top and bottom #104/#105 to the right pedal
by using 2x #122 screws and 1 x #30 screw. (See Fig.5A)
(C) Repeat the process for the left side pedal tube
(D) Attach the right pedal tube to the base frame crank arm (See Fig.5B)
(E) Secure the pedal tube to the base frame crank arm by using 1 x #17
washer and 1 x #12 M10 lock nut. Completely tighten with a wrench
(F) Repeat the process for the left side pedal tube
(G) Attach and secure the Rear pedal tube covers #108 and #109 to the right
pedal tube by using 4 x #122 screws.
(H) Repeat this process for the left side Using Rear pedal tube covers
#106/107 Tighten all fasteners now
(I) Insert the front right of the pedal tube #86 on to Action handle bar tube #70
and secure them together by using 2 x #18 Allen head bolts (See Fig. 5C)
Do not fully tighten these bolts. These should be tightened in step 9
(J) Repeat the process for the right side. Do not fully tighten these bolts.
These should be tightened in step
#122
12
#30
2
#12
2
#17
2
#18
4
Fig. 5A
Fig. 5C
Fig. 5B
Make sure both square moving Arm ( 98,and 99) toward the down direction, if
for any reason you have rotated the Swivel tube (l /R ) to occur the 98/99 arms
one of them towards up--just turn the Swivel tube 360 degree to make both
Moving towards to same down direction.
Wrong
Correct
Summary of Contents for T-300MX
Page 12: ...12 ASSE...
Page 20: ...20...
Page 23: ...23 Console cables connecting instruction...
Page 36: ...36...
Page 43: ...43 For Customer Service 1 267 808 3999 Email cs go elliptical com...