background image

Thank you for purchasing this Goldair product. Your product is warranted against faults and manufacture when
used in normal domestic use for a period of

two years.

In non-domestic use Goldair limits the voluntary warranty

to

three months.

Goldair undertake to repair or replace this product at no charge if found to be defective due to a manufacturing
fault during the warranty period.

This warranty excludes damage caused by misuse, neglect, shipping accident, incorrect installation, or work carried
out by anyone other than a qualified electrical service technician.

PLEASE KEEP YOUR RECEIPT AS THIS WILL HELP VERIFY YOUR WARRANTY.

The benefits given to you by this warranty are in addition to other rights and remedies available to you under law in
relation to the goods or services to which this warranty relates.

In Australia, our goods come with guarantees that cannot be excluded under the Australian Consumer Law. You are
entitled to a replacement or refund for a major failure and compensation for any other reasonably foreseeable loss
or damage. You are also entitled to have the goods repaired or replaced if the goods fail to be of acceptable quality
and the failure does not amount to a major failure.

In New Zealand this warranty is additional to the conditions and guarantees of the Consumers Guarantee Act
(1993).

Two 

Year

Warranty

Goldair Two Year Warranty 

(IMPORTANT: Please complete and retain this warranty card)

Name

Address

Place Of Purchase

Date Of Purchase

Name Of Product 

Model Number

Attach a copy of the purchase receipt  to this warranty card

Due to continual design improvements, the product illustrated in this User Manual may differ slightly from the actual product.

Goldair

New Zealand

CDB Goldair
PO Box 100-707
N.S.M.C
Auckland

Phone +64 (0)9 917 4000
Phone 0800 232 633

www.goldair.co.nz

Goldair

Australia

CDB Goldair Australia Pty

PO Box 574

South Morang

Victoria, 3752

Phone +61 (0)3 9365 5100

Phone 1300 GOLDAIR  (1300 465 324)

www.goldair.com.au

Summary of Contents for GLTR5C

Page 1: ...Curved Round Towel Warmers Operating Instructions For Models GLTR5C GNT7 GLTR7C GLTR9C ...

Page 2: ......

Page 3: ...ed products or dry cleaning fluids 11 Use this Towel Rail only with the voltage specified on the rating label 12 Do not immerse in liquid or allow liquid to run into the interior of the Towel Rail 13 Indoor use only 14 Do not operate this towel rail if damaged or after the Towel Rail malfunctions or has been dropped or damaged in any manner Return to a qualified electrical person for examination e...

Page 4: ... Screws Already fitted to Legs 5 1 x Pointed Grub Screw for use with Through Wall Bush 11 4 x Long Screws For mounting to wall 9 2 x Short Screws for Securing Upper Legs 4 1 x Through Wall Bush For Concealed Cable 6 1 x Concealed Cable Leg Cover 7 1 x Exposed Cable Grommet 12 4 x Wall Plugs 13 1 x Allen Key 10 2 x Screws already installed for Securing Lower Legs ...

Page 5: ...Height 570mm 800mm 800mm 1030mm Width 630mm 630mm 460mm 630mm Depth 140mm 140mm 135mm 140mm ELECTRICAL Wattage 40W 68W 65W 110W Colour Silver Silver Silver Silver Power supply 220 240 VAC 50Hz International Protection Rating IP55 Specifications ...

Page 6: ...GLTR5C Dimensions GLTR7C ...

Page 7: ...Dimensions continued GNT7 GLTR9C ...

Page 8: ...ances where installers drill incorrectly NOTE Attempting to fix into plasterboard or cement sheeting alone is not recommended Plasterboard in particular will not hold long term PRE WIRING NOTE Only drill holes when you are 100 sure of your measurements Provision should be made for a Timer to control the mains supply It is recommended that a Timer is used for energy saving purposes Goldair recommen...

Page 9: ...ion For the side that you do not use cut the power cable off as close to the white plastic lock that it comes through in the towel rail The two power cables are not connected to each other Installing your Towel Warmer A B Select desired position to mount towel rail with at least 300mm clearance from all permanent objects in surrounding area and 600mm above the floor The Ladder Towel Rail should be...

Page 10: ...d line up with and pass through 2 Align the short screw with the locator of the upper leg positions on the towel rail ensure grub screw is facing down Tighten so that the legs are secured onto the upright tube Do not overtighten leave just enough give to allow the leg to rotate and align parallel with other legs 3 Repeat steps 1 2 to attach the second upper leg 5 The last lower leg should be insta...

Page 11: ...insert a long screw through the mounting bush then fix into wall plug ensuring the fit is secure Do this for all 4 legs 12 Align your towel rail over the top of the mounting bushes ensure all legs cover the mounting bush Make sure the towel rail fits correctly Do not force into place if the alignment is not correct 11 If completing a concealed cable installation you will need to use the Through Wa...

Page 12: ...ff before cleaning Ensure that the towel rail has been allowed to cool down completely before cleaning Use a damp cloth not wet to wipe the exterior of the towel rail to remove dust and dirt Never use solutions such as benzene thinners or polishing agents Never use abrasive materials like steel wool scourers to scrub the towel rail Ensure the Towel Rail is dry before switching back on the mains su...

Page 13: ...under the Australian Consumer Law You are entitled to a replacement or refund for a major failure and compensation for any other reasonably foreseeable loss or damage You are also entitled to have the goods repaired or replaced if the goods fail to be of acceptable quality and the failure does not amount to a major failure In New Zealand this warranty is additional to the conditions and guarantees...

Page 14: ...New Zealand PO Box 100707 North Shore Mail Centre Auckland 0745 www goldair co nz Australia PO Box 574 South Morang Victoria 3752 www goldair com au ...

Reviews: