background image

Installing your Towel Rail

Always choose a safe location for the Towel Rail, keeping in mind the safety
precautions outlined. Ensure all packaging has been removed from the unit before
use.

WARNING: INSTALL MUST BE COMPLETED BY A REGISTERED ELECTRICIAN

WALL PREPARATION

Goldair Heated Towel Rails may be fixed to any type of wall, timber stud, steel stud or masonry (solid or cavity). Stud
walls (timber or steel) require studs at the correct position for all rails. If the precise position

can’t

be determined

early in the job, consider sheets of 18mm construction ply, covering a larger area.
WARNING: This rail has a small footprint against the wall. The wire holes and mounting holes must be drilled neatly
and accurately.
For drilling through hard materials such as porcelain tiles, marble, granite etc. an appropriate drill bit must be used.
No responsibility will be taken by Goldair for instances where installers drill incorrectly
NOTE: Attempting to fix into plasterboard or cement sheeting alone is not recommended. Plasterboard in particular
will not hold long term.

PRE WIRING

NOTE: Only drill holes when you are 100% sure of your measurements.
Provision should be made for a Timer to control the mains supply. It is recommended that a Timer is used for energy
saving purposes. Goldair recommend a Goldair Heated Towel Rail Timer (GBT100

not supplied).

MOUNTING

First, select which method of cord entry your installation situation requires

exposed or concealed. (please see images

below as an indication to the differences)

The accessory pack contains a set of 4 legs for your heated towel rail

one of which is a universal leg (used for both

concealed and exposed installations)

For concealed cord entry

you require the addition of a concealed cable leg cover (#6) to conceal the cord cut out.

OR

For exposed cord entry

you require the addition of an exposed cable grommet (#7) to the cord cut out.

WARNING: DO NOT connect both left and right hand wires, use only one side for your connection.

Summary of Contents for GLTR5C

Page 1: ...Curved Round Towel Warmers Operating Instructions For Models GLTR5C GNT7 GLTR7C GLTR9C ...

Page 2: ......

Page 3: ...ed products or dry cleaning fluids 11 Use this Towel Rail only with the voltage specified on the rating label 12 Do not immerse in liquid or allow liquid to run into the interior of the Towel Rail 13 Indoor use only 14 Do not operate this towel rail if damaged or after the Towel Rail malfunctions or has been dropped or damaged in any manner Return to a qualified electrical person for examination e...

Page 4: ... Screws Already fitted to Legs 5 1 x Pointed Grub Screw for use with Through Wall Bush 11 4 x Long Screws For mounting to wall 9 2 x Short Screws for Securing Upper Legs 4 1 x Through Wall Bush For Concealed Cable 6 1 x Concealed Cable Leg Cover 7 1 x Exposed Cable Grommet 12 4 x Wall Plugs 13 1 x Allen Key 10 2 x Screws already installed for Securing Lower Legs ...

Page 5: ...Height 570mm 800mm 800mm 1030mm Width 630mm 630mm 460mm 630mm Depth 140mm 140mm 135mm 140mm ELECTRICAL Wattage 40W 68W 65W 110W Colour Silver Silver Silver Silver Power supply 220 240 VAC 50Hz International Protection Rating IP55 Specifications ...

Page 6: ...GLTR5C Dimensions GLTR7C ...

Page 7: ...Dimensions continued GNT7 GLTR9C ...

Page 8: ...ances where installers drill incorrectly NOTE Attempting to fix into plasterboard or cement sheeting alone is not recommended Plasterboard in particular will not hold long term PRE WIRING NOTE Only drill holes when you are 100 sure of your measurements Provision should be made for a Timer to control the mains supply It is recommended that a Timer is used for energy saving purposes Goldair recommen...

Page 9: ...ion For the side that you do not use cut the power cable off as close to the white plastic lock that it comes through in the towel rail The two power cables are not connected to each other Installing your Towel Warmer A B Select desired position to mount towel rail with at least 300mm clearance from all permanent objects in surrounding area and 600mm above the floor The Ladder Towel Rail should be...

Page 10: ...d line up with and pass through 2 Align the short screw with the locator of the upper leg positions on the towel rail ensure grub screw is facing down Tighten so that the legs are secured onto the upright tube Do not overtighten leave just enough give to allow the leg to rotate and align parallel with other legs 3 Repeat steps 1 2 to attach the second upper leg 5 The last lower leg should be insta...

Page 11: ...insert a long screw through the mounting bush then fix into wall plug ensuring the fit is secure Do this for all 4 legs 12 Align your towel rail over the top of the mounting bushes ensure all legs cover the mounting bush Make sure the towel rail fits correctly Do not force into place if the alignment is not correct 11 If completing a concealed cable installation you will need to use the Through Wa...

Page 12: ...ff before cleaning Ensure that the towel rail has been allowed to cool down completely before cleaning Use a damp cloth not wet to wipe the exterior of the towel rail to remove dust and dirt Never use solutions such as benzene thinners or polishing agents Never use abrasive materials like steel wool scourers to scrub the towel rail Ensure the Towel Rail is dry before switching back on the mains su...

Page 13: ...under the Australian Consumer Law You are entitled to a replacement or refund for a major failure and compensation for any other reasonably foreseeable loss or damage You are also entitled to have the goods repaired or replaced if the goods fail to be of acceptable quality and the failure does not amount to a major failure In New Zealand this warranty is additional to the conditions and guarantees...

Page 14: ...New Zealand PO Box 100707 North Shore Mail Centre Auckland 0745 www goldair co nz Australia PO Box 574 South Morang Victoria 3752 www goldair com au ...

Reviews: