background image

Installing your Towel Rail

Always choose a safe location for the Towel Rail, keeping in mind the safety
precautions outlined. Ensure all packaging has been removed from the unit before
use.

WALL PREPARATION

Goldair Heated Towel Rails may be fixed to any type of timber stud, steel stud or
masonry (solid or cavity) wall.

Walls made from timber or steel require studs at the correct position for all rails. If the
precise position

can’t

be determined early in the job, consider sheets of 18mm

construction ply, covering a larger area.

This rail has a small footprint against the wall. The wire holes and mounting holes must
be drilled neatly and accurately.

For drilling through hard materials such as porcelain tiles, marble, granite etc. an
appropriate drill bit must be used.

No responsibility will be taken by Goldair for instances where installers drill incorrectly.

NOTE: Attempting to fix into plasterboard or cement sheeting alone is not
recommended. Plasterboard in particular will not hold long term.

PRE WIRING

NOTE: Only drill holes when you are 100% sure of your measurements.
A means for disconnection must be incorporated in the fixed wiring in accordance with
the wiring guidelines AS/NZS 3000:2007.

Provision should be made for a Timer to control the mains supply. It is recommended
that a Timer is used for energy saving purposes. Goldair recommend a Goldair Heated
Towel Rail Timer (GBT100

not supplied).

WALL MOUNTED TOWEL RAILS ARE ONLY TO BE MOUNTED ON HEAT 

RESISTANT WALLS THAT COMPLY WITH 

CURRENT

AS/NZS SPECIFICATIONS & 

BUILDING REGULATIONS

WARNING:

Installation must be completed by a registered electrician.

Summary of Contents for GTR5B

Page 1: ...Models GTR5B GTR7B Goldair Straight Round Towel Warmer Operating Instructions ...

Page 2: ...d as a result of this the Towel Rail will feel hotter to the touch during warmer periods Also the insulation effect of towels will cause the operating temperature to increase slightly 7 Means of disconnection must be incorporated in the fixed wiring in accordance with wiring guidelines AS NZS 3000 2007 8 The towel rail is to be installed so that switches and other controls cannot be touched by a p...

Page 3: ... areas where petrol paint or other flammable liquids are used or stored 22 Do not locate the Towel Rail directly below any power socket 23 When the Towel Rail has been unpacked check it for transport damage and ensure all parts have been delivered If parts are missing or the Towel Rail has been damaged contact the Goldair Customer Services Team 24 If your Towel Rail does not work or is not working...

Page 4: ...Dimensions GTR5B GTR7B ...

Page 5: ...as a cut out for exposed wire install 3 x Mounting Bush 4 x Grub Screws 4 x Long Screws For mounting to wall 2 x Screws for Securing Upper Legs 1 x Through Wall Bush For Concealed Cable 4 x Wall Plugs 1 x Allen Key 2 x Screws for Securing Lower Legs ...

Page 6: ...iles marble granite etc an appropriate drill bit must be used No responsibility will be taken by Goldair for instances where installers drill incorrectly NOTE Attempting to fix into plasterboard or cement sheeting alone is not recommended Plasterboard in particular will not hold long term PRE WIRING NOTE Only drill holes when you are 100 sure of your measurements A means for disconnection must be ...

Page 7: ...to mount towel rail with at least 300mm clearance from all permanent objects in surrounding area and the bottom rung must be 600mm above the floor The Ladder Towel Rail should be installed in accordance to local governing AS NZS regulations The Goldair Heated Towel Rail can only be mounted 1 way Your towel rail is mounted by legs with a screw on each of the 4 legs as indicated in Fig1 below A B Fi...

Page 8: ...eaded hole of the upper leg positions on the towel rail ensure grub screw is facing down Tighten so that the legs are secured onto the upright tube Do not overtighten leave just enough give to allow the leg to rotate and align parallel with other legs 3 Repeat steps 1 2 to attach the second upper leg 5 The last lower leg should be installed either in a concealed or exposed manner as per the previo...

Page 9: ...legs 11 Align your towel rail over the top of the 4 mounting bushes ensure all legs cover the mounting bushes Make sure the towel rail fits correctly do not force into place if the alignment is not correct 9B If completing a concealed cable installation you will need to use the Through Wall Bush for mounting the last leg Ensure you pass the power cable through the lug before installing to the wall...

Page 10: ... authorised electrical service technician CARE AND CLEANING The Towel Rail requires regular cleaning to ensure longevity of the product Turn off the isolating switch before cleaning For additional protection turn the mains supply off before cleaning Ensure that the towel rail has been allowed to cool down completely before cleaning Use a damp cloth not wet to wipe the exterior of the towel rail to...

Page 11: ...under the Australian Consumer Law You are entitled to a replacement or refund for a major failure and compensation for any other reasonably foreseeable loss or damage You are also entitled to have the goods repaired or replaced if the goods fail to be of acceptable quality and the failure does not amount to a major failure In New Zealand this warranty is additional to the conditions and guarantees...

Page 12: ...New Zealand PO Box 100707 North Shore Mail Centre Auckland 0745 www goldair co nz Australia PO Box 574 South Morang Victoria 3752 www goldair com au ...

Reviews: