General Instructions
GI-6126J12-01
GI-7
General technical specifications of repair
1. Disassembly procedure requirements
Before disassembly of any component, please take full considerations, park the bus on an even
and safe place, place the gearlever at the neutral position, flame out, disconnect the power supply
switch and wedge the front and rear wheels. It is very important to ensure the safety of repair
personnel and the bus.
Thoroughly clean relevant parts before disassembly of any component;
The disassembly of any assembly must be carried out at a clean place to avoid ingress of any
dust and foreign matter;
Upon disassembly of any subassembly, please place all components on a clean worktable
according to the sequence of disassembly; It helps to avoid component loss and make it
convenient for assembly in this way.
Use dedicated tools if possible to make it convenient for disassembly and avoid damages to the
components;
Take care of the forces applied on the shaft or housing and avoid damaging the component while
disassembling any component with a tool. Disassembly of some components is forbidden; It is
forbidden to exert an external force on any driven part that is running;
2. Assembly procedure requirements
Thoroughly clean all the components that need to be assembled. Do not allow ingress of any
dust and foreign matter into the transmission. Otherwise, unnecessary losses may be caused.
Take the following precautions during assembly;
Fastening bolts: fasten the bolts with the required torque; apply lubricating oils and other
sealants if required;
Reassemble in the correct sequence;
Initial lubrication: consider lubricating greases for initial lubrication to avoid scratches and dry
frictions;
Bearing installation: flanged bearing installer/remover is recommended for bearing installation.
Such type of installer/remover can exert forces on both the inner and outer rims of the bearing
simultaneously so that not only damages to the steel balls and inner/outer rims are avoided, but
also the concentricity of bearing, shaft and hole is guaranteed; Do not use installer/remover of a
pipe casing type because it exerts forces merely on one part of the inner and outer rims of the
bearing and thus may cause damages to the bearing;
Installation of O-rings: apply silicon lubricants before assembly of O-rings;
Installation of sealing gaskets: do not use removed sealing gaskets. Please use new gaskets
during reinstallation. Do not miss any sealing gasket. Otherwise, oil leakages or displacement
may be caused.
Sealant application: the surface shall be clean and dry and the sealants shall be applied evenly
and continuously;
1-9
Summary of Contents for XML6125CLE
Page 1: ......
Page 17: ...General Instructions GI 6126J12 01 GI 14 1 16 ...
Page 18: ...General Instructions GI 6126J12 01 GI 15 1 17 ...
Page 26: ......
Page 126: ......
Page 137: ......
Page 255: ...4 118 ...
Page 256: ...4 119 ...
Page 258: ......
Page 259: ...REPAIR MANUAL ZF DROP CENTER AXLE AV 132 II AV 132 II T 5871 214 102 en 5 1 ...
Page 340: ......
Page 344: ...SU 4 Suspension System ECAS Electric control system WABCO Bus ECAS operation manual 6 4 ...
Page 357: ......
Page 404: ......
Page 454: ...BR 50 Brake System BR 6125J93C 01 2 General schematic diagram of brake system 8 50 ...
Page 462: ...BR 58 Brake System BR 6125J93C 01 8 58 ...
Page 469: ...Break System BR 6125J93C 01 BR 65 8 65 ...
Page 470: ...BR 66 Brake System BR 6125J93C 01 8 66 ...
Page 471: ...Break System BR 6125J93C 01 BR 67 8 67 ...
Page 483: ...Break System BR 6125J93C 01 BR 79 8 79 ...
Page 485: ...Break System BR 6125J93C 01 BR 81 8 81 ...
Page 487: ......
Page 511: ...2019 12 17 CATL Confidential Introduction of Power Battery System CATL AFS STTG ...
Page 513: ...2019 12 17 CATL Confidential Page 3 Composition of Battery System Chapter 1 ...
Page 516: ...2019 12 17 CATL Confidential Page 6 Introduction of Battery System Hardware Chapter 2 ...
Page 518: ...Appendix 1 MSD 2019 12 17 CATL Confidential Page 8 MSD A With Fuse MSD B Without Fuse ...
Page 519: ...Appendix 2 Pressure Valve Upper Lid 2019 12 17 CATL Confidential Page 9 Outer side Inner side ...
Page 535: ...2019 12 17 CATL Confidential Page 25 Introduction of Battery Management System BMS Chapter 3 ...
Page 537: ...3 2 Electrical Schematic Diagram Example 2019 12 17 CATL Confidential Page 27 ...
Page 538: ...3 3 Principle Diagram of Battery Management System BMS 2019 12 17 CATL Confidential Page 28 ...
Page 539: ...CATL AMD CODE FOR DAILY USE OF EV BATTERY SYSTEM KongCF ...
Page 564: ...Thank you for watching Web http www catlbattery com Tel 400 918 0889 Any questions ...
Page 577: ...11 1 ...
Page 580: ...11 4 ...
Page 581: ...11 5 ...
Page 582: ...11 6 ...
Page 583: ...11 7 ...
Page 584: ...11 8 ...
Page 585: ...11 9 ...
Page 586: ...11 10 ...
Page 587: ...11 11 ...
Page 588: ...11 12 ...
Page 589: ...11 13 ...
Page 590: ... 11 14 ...
Page 591: ...11 15 ...
Page 593: ...11 17 ...
Page 595: ...11 19 ...
Page 597: ...GOLDEN DRAGON A 11 21 ...
Page 599: ...11 23 ...
Page 600: ...11 24 ...
Page 601: ...G H T w Air outlet 3 8 产品铭牌安装 位置 产品铭牌安装 位置 11 25 ...
Page 602: ...11 26 ...
Page 603: ...GOLDEN DRAGON 电源 故障 火警 负极 电源 故障 火警 正极 18 32VDC 负极 进风口 11 27 ...
Page 604: ...11 28 ...
Page 605: ...G H T w Air outlet 3 8 产品铭牌安 装位置 产品铭牌安 装位置 11 29 ...
Page 606: ...11 30 ...
Page 607: ...G H T w 产品铭牌安装 位置 产品铭牌安装 位置 11 31 ...
Page 608: ...11 32 ...
Page 609: ...11 33 ...
Page 610: ...11 34 ...
Page 611: ...G H T w 产品铭牌安装 位置 产品铭牌安装 位置 11 35 ...
Page 612: ...11 36 ...
Page 613: ...Air outlet 3 8 11 37 ...