PP-10
Propeller shaft
Inspection and repair
Inspection item
Standard value
Limit value
Solution
Inspection method
Transmission
shaft
damaged and
bent
0-0.6
1.0
{0.0393}
Replace
Welding seam
crack
-
-
Replace
Sliding spline
damaged
-
-
Replace
Sliding spline
clearance
0.62-0.174
{0.0025-0.0068}
0.25
{0.0098}
Replace
Clearance
between
universal joint
cross shaft and
needle bearing
(
C
)
(
C=A-B
)
0.02-0.054
{0.0008-0.0021}
0.1
{0.0039}
Replace needle
bearing
sub-assembly or
universal joint cross
shaft
3-10
Summary of Contents for XML6125CLE
Page 1: ......
Page 17: ...General Instructions GI 6126J12 01 GI 14 1 16 ...
Page 18: ...General Instructions GI 6126J12 01 GI 15 1 17 ...
Page 26: ......
Page 126: ......
Page 137: ......
Page 255: ...4 118 ...
Page 256: ...4 119 ...
Page 258: ......
Page 259: ...REPAIR MANUAL ZF DROP CENTER AXLE AV 132 II AV 132 II T 5871 214 102 en 5 1 ...
Page 340: ......
Page 344: ...SU 4 Suspension System ECAS Electric control system WABCO Bus ECAS operation manual 6 4 ...
Page 357: ......
Page 404: ......
Page 454: ...BR 50 Brake System BR 6125J93C 01 2 General schematic diagram of brake system 8 50 ...
Page 462: ...BR 58 Brake System BR 6125J93C 01 8 58 ...
Page 469: ...Break System BR 6125J93C 01 BR 65 8 65 ...
Page 470: ...BR 66 Brake System BR 6125J93C 01 8 66 ...
Page 471: ...Break System BR 6125J93C 01 BR 67 8 67 ...
Page 483: ...Break System BR 6125J93C 01 BR 79 8 79 ...
Page 485: ...Break System BR 6125J93C 01 BR 81 8 81 ...
Page 487: ......
Page 511: ...2019 12 17 CATL Confidential Introduction of Power Battery System CATL AFS STTG ...
Page 513: ...2019 12 17 CATL Confidential Page 3 Composition of Battery System Chapter 1 ...
Page 516: ...2019 12 17 CATL Confidential Page 6 Introduction of Battery System Hardware Chapter 2 ...
Page 518: ...Appendix 1 MSD 2019 12 17 CATL Confidential Page 8 MSD A With Fuse MSD B Without Fuse ...
Page 519: ...Appendix 2 Pressure Valve Upper Lid 2019 12 17 CATL Confidential Page 9 Outer side Inner side ...
Page 535: ...2019 12 17 CATL Confidential Page 25 Introduction of Battery Management System BMS Chapter 3 ...
Page 537: ...3 2 Electrical Schematic Diagram Example 2019 12 17 CATL Confidential Page 27 ...
Page 538: ...3 3 Principle Diagram of Battery Management System BMS 2019 12 17 CATL Confidential Page 28 ...
Page 539: ...CATL AMD CODE FOR DAILY USE OF EV BATTERY SYSTEM KongCF ...
Page 564: ...Thank you for watching Web http www catlbattery com Tel 400 918 0889 Any questions ...
Page 577: ...11 1 ...
Page 580: ...11 4 ...
Page 581: ...11 5 ...
Page 582: ...11 6 ...
Page 583: ...11 7 ...
Page 584: ...11 8 ...
Page 585: ...11 9 ...
Page 586: ...11 10 ...
Page 587: ...11 11 ...
Page 588: ...11 12 ...
Page 589: ...11 13 ...
Page 590: ... 11 14 ...
Page 591: ...11 15 ...
Page 593: ...11 17 ...
Page 595: ...11 19 ...
Page 597: ...GOLDEN DRAGON A 11 21 ...
Page 599: ...11 23 ...
Page 600: ...11 24 ...
Page 601: ...G H T w Air outlet 3 8 产品铭牌安装 位置 产品铭牌安装 位置 11 25 ...
Page 602: ...11 26 ...
Page 603: ...GOLDEN DRAGON 电源 故障 火警 负极 电源 故障 火警 正极 18 32VDC 负极 进风口 11 27 ...
Page 604: ...11 28 ...
Page 605: ...G H T w Air outlet 3 8 产品铭牌安 装位置 产品铭牌安 装位置 11 29 ...
Page 606: ...11 30 ...
Page 607: ...G H T w 产品铭牌安装 位置 产品铭牌安装 位置 11 31 ...
Page 608: ...11 32 ...
Page 609: ...11 33 ...
Page 610: ...11 34 ...
Page 611: ...G H T w 产品铭牌安装 位置 产品铭牌安装 位置 11 35 ...
Page 612: ...11 36 ...
Page 613: ...Air outlet 3 8 11 37 ...