10.2.2.1.2. Installation of phase cables
Step 1: Check the appearance of the phase cable. The surface should be free from damage, no rust on the surface of
the terminal, and no surface corrosion.
Step 2: Remove the cable gland base from the cable line, and then apply a small amount of FN-0088 grease evenly
on the surface of the fixed O-ring.
Step 3: Manually screw the cable gland base on the controller housing, the O-ring not be damaged during the screwing.
Step 4: Use the special tool of gland to tighten the cable gland base to ensure the tightening torque 25 ± 3Nm
Step 5: Take 1 cable, insert the terminal into the controller, and then use a hexwrench to attach a HW-2316
combination screw that fixes the terminal
Step 6: Use a torque wrench to tighten HW-2316 combination screw to ensure a tightening torque of 20Nm
Step 7: Tighten the cable gland and base, tightening torque 12 ± 2Nm
Step 8: Repeat steps 1-7 to complete the installation of the remaining 5 cables.
Step 9: Check whether there is any foreign matter in the cover of the phase end entering the controller;
Step 10: If the cover plate is deformed or the sealing gasket is damaged, a new cover needs to be replaced.
Step 11: Place one phase cover on the controller cover, screw the hexagon flange bolt (part number: HW-3311), and
first tightening the middle two and then diagonal Tighten the remaining hex flange bolts. The torque is 20 ± 2Nm.
Step 12: Repeat step 11 to complete the installation of another phase end cover.
10.2.2.1.3. Steps for removing positive and negative cables: see the diagram (Figure 5)
Step 1: Using a socket wrench, remove the 6 HW-3311 hexagon flange bolts which fixes the DC junction box cover;
Step 2: Check that the surface of the DC junction box cover is not scratched, the seal is not damaged, and not deformed.
Step 3: Using a hexagon wrench, loosen the two HW-2316 combination screws fixed by the positive cable lug;
Step 4: Use the gland special wrench to loosen the gland base, and then remove the positive cable;
Step 5: Remove the negative cable according to steps 3-4.
Step 6: Use the gland special wrench to remove the cable gland base from the controller housing;
Step 7: Make sure no foreign objects or screws should fall into the controller.
Note: Before removing the positive and negative cables, the positive and negative cables must be removed from
PDU first, and cannot be removed in a charged state.
10.2.2.1.4. Steps for replacing and installing positive and negative cables:
Step 1: Check the appearance of the positive and negative cables. The surface should be free from damage, and no
rust or surface corrosion on the terminal surface.
Step 2: Remove the cable gland base from the cable, and then apply a small amount of FN-0088 grease evenly on the
surface of the fixed O-ring.
Step 3: Manually screw the cable gland base into the threaded hole of the controller housing, and check that the O-
ring should not be damaged during the screwing.
Step 4: Use the gland special tool to tighten the cable gland base to ensure the tightening torque 15Nm ± 2Nm
Step 5: Take the positive cable, insert the terminal into the controller, and then use a hexwrench to attach a HW-2316
combination screw that fixes the lug
Step 6: Use a torque wrench to tighten one HW-2136 combination screw to ensure a torque of 10Nm ± 2Nm
2-77
Summary of Contents for XML6125CLE
Page 1: ......
Page 17: ...General Instructions GI 6126J12 01 GI 14 1 16 ...
Page 18: ...General Instructions GI 6126J12 01 GI 15 1 17 ...
Page 26: ......
Page 126: ......
Page 137: ......
Page 255: ...4 118 ...
Page 256: ...4 119 ...
Page 258: ......
Page 259: ...REPAIR MANUAL ZF DROP CENTER AXLE AV 132 II AV 132 II T 5871 214 102 en 5 1 ...
Page 340: ......
Page 344: ...SU 4 Suspension System ECAS Electric control system WABCO Bus ECAS operation manual 6 4 ...
Page 357: ......
Page 404: ......
Page 454: ...BR 50 Brake System BR 6125J93C 01 2 General schematic diagram of brake system 8 50 ...
Page 462: ...BR 58 Brake System BR 6125J93C 01 8 58 ...
Page 469: ...Break System BR 6125J93C 01 BR 65 8 65 ...
Page 470: ...BR 66 Brake System BR 6125J93C 01 8 66 ...
Page 471: ...Break System BR 6125J93C 01 BR 67 8 67 ...
Page 483: ...Break System BR 6125J93C 01 BR 79 8 79 ...
Page 485: ...Break System BR 6125J93C 01 BR 81 8 81 ...
Page 487: ......
Page 511: ...2019 12 17 CATL Confidential Introduction of Power Battery System CATL AFS STTG ...
Page 513: ...2019 12 17 CATL Confidential Page 3 Composition of Battery System Chapter 1 ...
Page 516: ...2019 12 17 CATL Confidential Page 6 Introduction of Battery System Hardware Chapter 2 ...
Page 518: ...Appendix 1 MSD 2019 12 17 CATL Confidential Page 8 MSD A With Fuse MSD B Without Fuse ...
Page 519: ...Appendix 2 Pressure Valve Upper Lid 2019 12 17 CATL Confidential Page 9 Outer side Inner side ...
Page 535: ...2019 12 17 CATL Confidential Page 25 Introduction of Battery Management System BMS Chapter 3 ...
Page 537: ...3 2 Electrical Schematic Diagram Example 2019 12 17 CATL Confidential Page 27 ...
Page 538: ...3 3 Principle Diagram of Battery Management System BMS 2019 12 17 CATL Confidential Page 28 ...
Page 539: ...CATL AMD CODE FOR DAILY USE OF EV BATTERY SYSTEM KongCF ...
Page 564: ...Thank you for watching Web http www catlbattery com Tel 400 918 0889 Any questions ...
Page 577: ...11 1 ...
Page 580: ...11 4 ...
Page 581: ...11 5 ...
Page 582: ...11 6 ...
Page 583: ...11 7 ...
Page 584: ...11 8 ...
Page 585: ...11 9 ...
Page 586: ...11 10 ...
Page 587: ...11 11 ...
Page 588: ...11 12 ...
Page 589: ...11 13 ...
Page 590: ... 11 14 ...
Page 591: ...11 15 ...
Page 593: ...11 17 ...
Page 595: ...11 19 ...
Page 597: ...GOLDEN DRAGON A 11 21 ...
Page 599: ...11 23 ...
Page 600: ...11 24 ...
Page 601: ...G H T w Air outlet 3 8 产品铭牌安装 位置 产品铭牌安装 位置 11 25 ...
Page 602: ...11 26 ...
Page 603: ...GOLDEN DRAGON 电源 故障 火警 负极 电源 故障 火警 正极 18 32VDC 负极 进风口 11 27 ...
Page 604: ...11 28 ...
Page 605: ...G H T w Air outlet 3 8 产品铭牌安 装位置 产品铭牌安 装位置 11 29 ...
Page 606: ...11 30 ...
Page 607: ...G H T w 产品铭牌安装 位置 产品铭牌安装 位置 11 31 ...
Page 608: ...11 32 ...
Page 609: ...11 33 ...
Page 610: ...11 34 ...
Page 611: ...G H T w 产品铭牌安装 位置 产品铭牌安装 位置 11 35 ...
Page 612: ...11 36 ...
Page 613: ...Air outlet 3 8 11 37 ...