Contemporary Amperex Technology Co.,Ltd.
宁德时代新能源科技股份有限公司
DOC NO.
AFSP-OM-01
VER.
After-sale System Process
FORM NO.
QF-T-AFSP-A
User Manual of E-BUS Power Battery System
( ) Level 3 Privacy ( ) Level 2 High Density (√ ) Level 1 Low Density ( ) Level 0 Public
第 6 页
1.7
Instructions of Routine Inspection
1.7.1
The vehicle should be comprehensively inspected once a year in operation. Specific inspection items are as
follows:
Whether the high/low-voltage harness and connector of the battery system are scratched, damaged or loose
Whether the battery box or high-voltage box has sludge, crack or odor or is subject to deformation or
expansion
Whether the pneumatic balance valve or explosion-proof valve of the battery box is damaged
Whether the battery box and high-pressure box are securely connected with the frame
Prompt
i.
Wear the insulating shoes, insulating gloves, goggles and other protective
articles in order to ensure the personal safety before inspection
ii.
If any anomaly is found in inspection, contact our after-sales service
department or service station for help. Do not repair the vehicle without
permission
1.7.2
A comprehensive inspection of the water-cooled unit is required before the summer season. The specific
items are as follows:
Check if the liquid level of the expansion tank is normal (should be 2/3 or more liquid level). If it is not
enough, please refill the liquid, and then check if the water circulation is normal
Check the air inlet of the unit for any blockage. If it is found to be abnormal, clean it and wipe the filter with a
clean cloth
Prompt
For vehicles equipped with water-cooled units, if the average battery temperature
exceeds 50 °C during high-temperature operation in summer, it is an abnormal
situation, please check the water-cooled unit as required. If the problem still cannot be
solved, please contact after-sales service station for assistance
1.8
Functions of Manual Maintenance Switch
a)
The manual maintenance switch is a kind of orange electrical component which is used for
manually cutting off the high-voltage line and achieving the function of safety protection
(see the right figure)
b)
The
manual maintenance switch should be disconnected before overhaul and
installed in place after overhaul
Summary of Contents for XML6125CLE
Page 1: ......
Page 17: ...General Instructions GI 6126J12 01 GI 14 1 16 ...
Page 18: ...General Instructions GI 6126J12 01 GI 15 1 17 ...
Page 26: ......
Page 126: ......
Page 137: ......
Page 255: ...4 118 ...
Page 256: ...4 119 ...
Page 258: ......
Page 259: ...REPAIR MANUAL ZF DROP CENTER AXLE AV 132 II AV 132 II T 5871 214 102 en 5 1 ...
Page 340: ......
Page 344: ...SU 4 Suspension System ECAS Electric control system WABCO Bus ECAS operation manual 6 4 ...
Page 357: ......
Page 404: ......
Page 454: ...BR 50 Brake System BR 6125J93C 01 2 General schematic diagram of brake system 8 50 ...
Page 462: ...BR 58 Brake System BR 6125J93C 01 8 58 ...
Page 469: ...Break System BR 6125J93C 01 BR 65 8 65 ...
Page 470: ...BR 66 Brake System BR 6125J93C 01 8 66 ...
Page 471: ...Break System BR 6125J93C 01 BR 67 8 67 ...
Page 483: ...Break System BR 6125J93C 01 BR 79 8 79 ...
Page 485: ...Break System BR 6125J93C 01 BR 81 8 81 ...
Page 487: ......
Page 511: ...2019 12 17 CATL Confidential Introduction of Power Battery System CATL AFS STTG ...
Page 513: ...2019 12 17 CATL Confidential Page 3 Composition of Battery System Chapter 1 ...
Page 516: ...2019 12 17 CATL Confidential Page 6 Introduction of Battery System Hardware Chapter 2 ...
Page 518: ...Appendix 1 MSD 2019 12 17 CATL Confidential Page 8 MSD A With Fuse MSD B Without Fuse ...
Page 519: ...Appendix 2 Pressure Valve Upper Lid 2019 12 17 CATL Confidential Page 9 Outer side Inner side ...
Page 535: ...2019 12 17 CATL Confidential Page 25 Introduction of Battery Management System BMS Chapter 3 ...
Page 537: ...3 2 Electrical Schematic Diagram Example 2019 12 17 CATL Confidential Page 27 ...
Page 538: ...3 3 Principle Diagram of Battery Management System BMS 2019 12 17 CATL Confidential Page 28 ...
Page 539: ...CATL AMD CODE FOR DAILY USE OF EV BATTERY SYSTEM KongCF ...
Page 564: ...Thank you for watching Web http www catlbattery com Tel 400 918 0889 Any questions ...
Page 577: ...11 1 ...
Page 580: ...11 4 ...
Page 581: ...11 5 ...
Page 582: ...11 6 ...
Page 583: ...11 7 ...
Page 584: ...11 8 ...
Page 585: ...11 9 ...
Page 586: ...11 10 ...
Page 587: ...11 11 ...
Page 588: ...11 12 ...
Page 589: ...11 13 ...
Page 590: ... 11 14 ...
Page 591: ...11 15 ...
Page 593: ...11 17 ...
Page 595: ...11 19 ...
Page 597: ...GOLDEN DRAGON A 11 21 ...
Page 599: ...11 23 ...
Page 600: ...11 24 ...
Page 601: ...G H T w Air outlet 3 8 产品铭牌安装 位置 产品铭牌安装 位置 11 25 ...
Page 602: ...11 26 ...
Page 603: ...GOLDEN DRAGON 电源 故障 火警 负极 电源 故障 火警 正极 18 32VDC 负极 进风口 11 27 ...
Page 604: ...11 28 ...
Page 605: ...G H T w Air outlet 3 8 产品铭牌安 装位置 产品铭牌安 装位置 11 29 ...
Page 606: ...11 30 ...
Page 607: ...G H T w 产品铭牌安装 位置 产品铭牌安装 位置 11 31 ...
Page 608: ...11 32 ...
Page 609: ...11 33 ...
Page 610: ...11 34 ...
Page 611: ...G H T w 产品铭牌安装 位置 产品铭牌安装 位置 11 35 ...
Page 612: ...11 36 ...
Page 613: ...Air outlet 3 8 11 37 ...