21
41. Route the Long Cable (54) over a 90mm Pulley
(58). Attach the 90mm Pulley and a Small Cable
Trap (63) to the left Side Top Frame (13) with
an M10 x 49mm Button Bolt (104) and an M10
Locknut (79).
Make sure that the Small Cable
Trap is oriented to hold the Long Cable in
the groove of the 90mm Pulley.
42. Route the Long Cable (54) under a 90mm
Pulley (58). Attach the 90mm Pulley and two
Half Guards (40) to the left Base (1) with an
M10 x 46mm Button Bolt (96) and an M10
Locknut (79).
43. Route the Long Cable (54) around a 110mm
Pulley (59). Attach the 110mm Pulley, a Long
Cable Trap (62), an M10 Washer (84), and a
Large Full Guard (103) to the Center Base (2)
with an M10 x 76mm Button Bolt (102) and an
M10 Locknut (79).
Make sure that the Long
Cable Trap is oriented to hold the Long
Cable in the groove of the 110mm Pulley.
54
58
40
40
79
1
96
43
79
54
59
84
103
62
102
2
79
13
63
58
54
104
44. Route the Long Cable (54) under a 90mm
Pulley (58). Attach the 90mm Pulley and two
Half Guards (40) to the Center Base (2) with an
M10 x 46mm Button Bolt (96) and an M10
Locknut (79).
79
40
40
58
54 2
96
42
44
41
Summary of Contents for Platinum GGBE6958.1
Page 37: ...37 NOTES ...