3.
Bolt the main gear to the bottom of the fuselage using the supplied screws and stainless steel Self-locking
nuts. Place the bolts in through the can tunnel opening with appropriate size spanner. Remember the
gear will rake forward.
4.
Adjust the position of the landing gear fairings, the secure with glue (shoe goo type).