COWLING INSTALLATION
NOTE: There are pictures of different planes in this manual, however, this plane’s cowling is assembled the
same way.
1.
The cowl is secured with four 3 X 14mm bolts and washers.Apply nutlock onto the bolts as the
vibration from the gas engine will shake them come loose.
2. Labels are provided for aligning the drill holes for the cowl. Stick then on without the cowl, mark the hole.
Fit the cowl then press back down. The hole will then show the area to drill. Sere below.