background image

46

1.

CFM in chart is without filters(s). Filters do not ship with this furnace, but must be provided by the installer. If the furnace requires two return filters, this chart assumes
both filters are installed.

2.

All furnaces ship as high speed cooling and medium-speed heating. Installer must adjust blower cooling & heating speed as needed.

3.

For most jobs, about 400 CFM per ton when cooling is desirable.

4.

INSTALLATION IS TO BE ADJUSTED TO OBTAIN TEMPERATURE RISE WITHIN THE RANGE SPECIFIED ON THE RATING PLATE.

5.

The chart is for information only. For satisfactory operation, external static pressure must not exceed value shown on rating plate. The shaded area indicates ranges
in excess of maximum external static pressure allowed when heating. The data for 0.6" w.c. to 0.8" w.c. is shown fo air conditioning purposes only.

6.

 At higher altitudes, a properly de-rated unit will have approximately the same temperature rise at a particular CFM, while the ESP at that CFM will be lower.

AMEH96

BLOWER PERFORMANCE DATA

0.6

0.7

0.8

CFM

RISE

CFM

RISE

CFM

RISE

CFM

RISE

CFM

RISE

CFM

CFM

CFM

T1 - YELLOW

1.5

726

48

670

53

617

57

553

64

490

72

429

378

336

T2 - RED

2.0

905

39

860

41

812

43

761

46

712

49

663

610

574

T3 - ORANGE

2.5

1121

31

1074

33

1039

34

998

35

959

37

923

882

839

T4 - BLUE

3.0

1274

28

1239

28

1199

29

1166

30

1129

31

1096

1059

1021

T5 - BLACK

3.0

1306

27

1261

28

1232

29

1195

29

1162

30

1132

1090

1057

T1 - YELLOW

1.5

714

80

667

79

604

87

548

96

484

109

422

367

325

T2 - RED

2.0

904

58

851

62

804

66

761

69

708

75

664

612

572

T3 - ORANGE

2.5

1125

47

1075

49

1045

51

999

53

956

55

921

877

839

T4 - BLUE

3.0

1312

40

1271

42

1228

43

1202

44

1165

45

1127

1087

1044

T5 - BLACK

3.5

1423

37

1386

38

1354

39

1321

40

1278

41

1210

1134

1032

T1 - YELLOW

3.0

1297

54

1253

56

1209

58

1161

61

1111

63

1067

1022

974

T2 - RED

3.5

1507

47

1455

48

1422

49

1377

51

1334

53

1296

1251

1195

T3 - ORANGE

4.0

1677

42

1637

43

1602

44

1562

45

1526

46

1484

1441

1324

T4 - BLUE

4.0

1879

37

1842

38

1800

39

1762

40

1700

41

1566

1437

1319

T5 - BLACK

5.0

2044

35

1967

36

1894

37

1795

39

1702

41

1578

1452

1320

T1 - YELLOW

3.0

1331

66

1275

69

1206

73

1145

77

1080

81

1021

953

889

T2 - RED

3.5

1512

58

1452

60

1392

63

1336

66

1279

69

1219

1175

1115

T3 - ORANGE

4.0

1713

51

1666

53

1614

57

1569

56

1513

58

1468

1414

1364

T4 - BLUE

4.0

1892

46

1845

48

1802

49

1752

50

1707

52

1656

1614

1577

T5 - BLACK

5.0

2080

42

2038

43

2005

44

1960

45

1920

46

1879

1843

1791

AMEH960603BX*  

(MED-HI)

AMEH960805CX*  

(MED-HI)

(CFM & TEMPERATURE RISE VS. EXTERNAL STATIC PRESSURE)

0.4

0.5

AMEH960403BX*  

(MED-HI)

AMEH961005DX*  

(MED-HI)

EXTERNAL STATIC PRESSURE (Inches Water Column)

Model

--------------

Heating Speed

As Shipped

0.3

Motor

Speed

Tons

AC at 

0.5"

ESP

0.1

0.2

Summary of Contents for ACSH96

Page 1: ...nking before acting Most dealers have a list of specific good safety practices follow them The precautions listed in this Installation Manual are intended as supplemental to existing practices However...

Page 2: ...MENTS 16 STANDARD FURNACE CONNECTIONS 16 ALTERNATE FURNACE CONNECTIONS 17 NON DIRECT VENT SINGLE PIPE PIPING 18 DIRECT VENT DUAL PIPE PIPING 19 VENT INTAKE TERMINATIONS FOR INSTALLATION OF MULTIPLE DI...

Page 3: ...OWER UP 37 HEATING MODE 37 MODE DIP SWITCH IS SET TO 1 STG POSITION 37 MODE DIP SWITCH IS SET TO 2 STG POSITION 38 COOLING MODE 38 FAN ONLY MODE 38 XVI Operational Checks 38 BURNER FLAME 38 XVII Safet...

Page 4: ...ed throughout the structure if the furnace or air handler is operating in any mode CO can cause serious illness including permanent brain damage or death B10259 216 TO THE INSTALLER Before installing...

Page 5: ...Electrical Connection Inlets Alternate 18 Coil Front Cover Pressure Tap 19 Coil Front Cover Drain Port 20 Drain Line Penetrations 21 Drain Trap 22 Blower Door Interlock Switch 23 Capacitor 24 Integra...

Page 6: ...verted to operate on L P gas by using the appropriate L P conver sion kit listed in the PROPANE GAS HIGH ALTITUDE INSTALLA TIONS section of this manual Install this furnace only in a location and posi...

Page 7: ...TO SHUT OFF TURN OFF THE MANUAL GAS SHUTOFF VALVE EXTERNAL TO THE FURNACE BEFORE TURNING OFF THE ELECTRICAL SUPPLY WARNING POSSIBLE PROPERTY DAMAGE PERSONAL INJURY OR DEATH DUE TO FIRE EXPLOSION SMOK...

Page 8: ...eaning solutions such as perchloroethylene printing inks paint removers varnishes hydrochloric acid cements and glues antistatic fabric softeners for clothes dryers and masonry acid washing materials...

Page 9: ...latest edition of the National Fuel Gas Code NFPA 54 ANSI Z223 1 and or CSA B149 1 05 1 05 Installation Codes Seal off a non direct vent furnace if it is installed near an area frequently contaminated...

Page 10: ...part of the unconfined space 5 3 3 Equipment Located in Confined Spaces a All Air from Inside the Building The confined space shall be pro vided with two permanent openings communicating directly wit...

Page 11: ...Water Heater Outlet Air Chimney or Gas Vent NOTE The inlet and outlet air openings must each have a free area of not less than one square inch per 4000 BTU of the total input rating of all equipment i...

Page 12: ...ions Refer to Recommended Installation Positions figure for appropriate in stallation positions ductwork connections and resulting airflow arrangements VII HORIZONTALAPPLICATIONS CONSIDERATIONS GENERA...

Page 13: ...The indicated kits must be used to insure safe and proper furnace operation All conversions must be performed by a qualified installer or service agency AIR DISCHARGE AIR DISCHARGE AIR DISCHARGE Bott...

Page 14: ...G Clearance to inside corner H Clearance to each side of center line extended above meter regulator assembly 3 ft 91 cm within a height 15 ft 4 5 m above the meter regulator assembly OTHER THAN DIRECT...

Page 15: ...d Fittings must be DWV type fit tings meeting ASTM D2665 and ASTM D3311 Carefully follow the manufactures instructions for cutting cleaning and solvent cement ing of PVC In addition to PVC and ABS pip...

Page 16: ...insulated and closed with a weather tight corrosion resistant flashing STANDARD FURNACE CONNECTIONS It is the responsibility of the installer to ensure that the piping con nections to the furnace are...

Page 17: ...ELBOW NON DIRECT VENT 90 PVC ELBOW NON DIRECT VENT STANDARD CONNECTIONS OR OR UPFLOW COUNTERFLOW ALTERNATE FURNACE CONNECTIONS If the standard locations are undesirable for a specific installation al...

Page 18: ...105 98 91 84 Not Applicable Not Applicable MH95 ACSH96 AMEH96 GCH95 GME95 Direct Vent 2 Pipe and Non Direct Vent 1 Pipe 6 Maximum Allowable Length of Vent Flue Pipe Combustion Air Pipe ft 1 2 Unit Inp...

Page 19: ...ameter for construction of the vent flue and combustion air intake pipe systems of a direct vent dual pipe installation The number of elbows tabulated represents the number of elbows and or tees in ea...

Page 20: ...e outside the structure and may be installed with the intake and exhaust pipes located side by side or with one pipe above the other This kit is NOT intended for use with single pipe indirect vent ins...

Page 21: ...trap secured to the outside of the cabinet NOTE Refer to Alternate Vent Flue Hose Connections for upright installations using an alternate vent flue outlet 1 Remove the rubber plug from the right side...

Page 22: ...ber elbow Discard cut portion 5 Insert Tube 1 into rubber elbow drain port and secure with a silver hose clamp Angle tube toward trap 6 Cut 17 3 4 inches from the long end of Hose B and discard 7 Secu...

Page 23: ...mp Angle tube outward toward front of furnace 5 Cut X inches from the long end of Hose B and discard Refer to table for appropriate length to cut Secure remaining hose to Tube 1 with a green hose clam...

Page 24: ...ked drain conditions Cut hose to appropriate length to minimize sagging Plug left unused pressure tap with plug removed from right side 2 Secure HoseA to front cover drain tap with a red hose clamp Ro...

Page 25: ...a hose to the induced draft blower housing 6 Cut 5 1 2 inches straight length from the long end of each Tube 2 and discard radius ends 7 Insert approximately one inch of each Tube 2 through left side...

Page 26: ...blower door For direct vent applica tions the cabinet opening to the junction box must be sealed air tight using either a UL approved bushing such as Heyco Liquid Tight or by applying a UL approved no...

Page 27: ...ire routing must not to interfere with circulator blower operation filter removal or routine maintenance Refer to the follow ing figure for thermostat connections to the integrated control module term...

Page 28: ...n specified on the furnace rating plate The combination of the lower air density and a lower manifold pressure will prohibit the burner orifice from drawing the proper amount of air into the burner Th...

Page 29: ...m of three inches long Install a 1 8 NPT pipe plug fitting accessible for test gauge connection immediately upstream of the gas supply connection to the furnace Always use a back up wrench when making...

Page 30: ...ch pipe fittings starting from the gas valve to reach the outside of the cabinet must be supplied 1 Close nipple 1 90 degree street elbow 1 2 1 2 pipe nipple 1 90 degree elbow Straight Pipe The straig...

Page 31: ...vert to capacities at 5 psig settings multiply by 0 879 Propane Gas Piping Chart I Sizing Between Single or Second Stage Regulator and Appliance Maximum Propane Capacities Listed are Based on 1 2 W C...

Page 32: ...s retaining the sheet metal over the duct opening Using tin snips cut the metal strips and remove the sheet metal to free the duct flanges Using the scribe line along the duct flange as a guide unfold...

Page 33: ...e HORIZONTAL INSTALLATIONS Filters must be installed in either the central return register or in the return air duct work XIV STARTUP PROCEDURE ADJUSTMENT Furnace must have a 115 VAC power supply prop...

Page 34: ...OR EQUIPMENT DAMAGE THE INLET GAS SUPPLY PRESSURE MUST BE AS SPECIFIED ON THE UNIT RATING PLATE WITH ALL OTHER HOUSEHOLD GAS FIRED APPLIANCES OPERATING CAUTION The line pressure supplied to the gas va...

Page 35: ...ach a hose and manometer to the outlet pressure barb fitting Honeywell valve or outlet pressure tap White Rodgers valve 5 Turn ON the gas supply 6 Turn on power and close thermostat R and W1 contacts...

Page 36: ...hermometer readings to stabilize 4 Adjust temperature rise by adjusting the circulator blower speed Increase blower speed to reduce temperature rise Decrease blower speed to increase temperature rise...

Page 37: ...to 12 minutes NOTE The ACSH AMH AMEH GCH GDH GMH and GME hybrid furnaces require a single stage thermostat These furnaces utilize a control board with single stage or two stage capability The second s...

Page 38: ...ws R and Y thermostat contacts close initiating a call for cool Integrated control module performs safety circuit checks Outdoor fan and compressor are energized Circulator blower is energized on cool...

Page 39: ...mly touch a clean unpainted metal surface of the furnaces near the control Any tools held in a person s hand during grounding will be discharged 3 Service integrated control module or connecting wirin...

Page 40: ...emove 1 Turn OFF electrical power to furnace 2 Remove filter s from the central return register or ductwork 3 Replace filter s by reversing the procedure for removal 4 Turn ON electrical power to furn...

Page 41: ...nal problem Perform the checks listed in Section XIV Startup Procedure andAdjustments to reduce the chances of repeated fouling XX BEFORE LEAVING AN INSTALLATION Cycle the furnace with the thermostat...

Page 42: ...kage proper length elbows and termination Check drain system Correct as necessary Correct pressure switch setpoint or contact motion Tighten or correct wiring connection Pressure switch hose blocked p...

Page 43: ...e and air inlet piping for blockage proper length elbows and termination Correct as necessary Check rollout limit Replace if necessary Check induced draft blower for proper performance Replace if nece...

Page 44: ...4 793 MED HI MED LO 2 0 981 61 962 62 943 63 917 65 888 67 830 764 665 LOW 1 5 750 79 730 81 714 83 692 86 657 90 620 570 502 HIGH 4 0 2069 29 1965 30 1871 32 1756 34 1661 36 1549 1415 1275 MH950704CX...

Page 45: ...9 534 HIGH 3 0 1431 42 1368 44 1296 47 1228 49 1150 53 1055 962 860 ACSH960703BX MED 2 5 1212 50 1182 51 1138 53 1091 55 1019 59 944 871 769 MED HI MED LO 2 0 1002 60 978 62 956 63 921 66 878 69 825 7...

Page 46: ...039 34 998 35 959 37 923 882 839 T4 BLUE 3 0 1274 28 1239 28 1199 29 1166 30 1129 31 1096 1059 1021 T5 BLACK 3 0 1306 27 1261 28 1232 29 1195 29 1162 30 1132 1090 1057 T1 YELLOW 1 5 714 80 667 79 604...

Page 47: ...682 619 534 HIGH 3 0 1431 42 1368 44 1296 47 1228 49 1150 53 1055 962 860 GCH950703BX MED 2 5 1212 50 1182 51 1138 53 1091 55 1019 59 944 871 769 MED HI MED LO 2 0 1002 60 978 62 956 63 921 66 878 69...

Page 48: ...039 34 998 35 959 37 923 882 839 T4 BLUE 3 0 1274 28 1239 28 1199 29 1166 30 1129 31 1096 1059 1021 T5 BLACK 3 0 1306 27 1261 28 1232 29 1195 29 1162 30 1132 1090 1057 T1 YELLOW 1 5 714 80 667 79 604...

Page 49: ...DOOR OPEN DOOR SWITCH WARNING DISCONNECT POWER BEFORE SERVICING WIRING TO UNIT MUST BE PROPERLY POLARIZED AND GROUNDED BK GND DISCONNECT L POWER SUPPLY WITH OVERCURRENT PROTECTION DEVICE WH JUNCTION B...

Page 50: ...the unit for the most up to date wiring HIGH VOLTAGE D ISCONNECT ALL POWER BEFORE SERVICING OR INSTALLING THIS UNIT M ULTIPLE POWER SOURCES MAY BE PRESENT F AILURE TO DO SO MAY CAUSE PROPERTY DAMAGE...

Page 51: ...the wiring diagram on the unit for the most up to date wiring HIGH VOLTAGE D ISCONNECT ALL POWER BEFORE SERVICING OR INSTALLING THIS UNIT M ULTIPLE POWER SOURCES MAY BE PRESENT F AILURE TO DO SO MAY C...

Page 52: ...t vent terminal for the horizontally vented gas fueled heating appliance or equipment The sign shall read in print size no less than one half 1 2 inch in size GAS VENT DIRECTLY BELOW KEEP CLEAR OF ALL...

Page 53: ...53 THIS PAGE LEFT INTENTIONALLY BLANK...

Page 54: ...54 THIS PAGE LEFT INTENTIONALLY BLANK...

Page 55: ...55 THIS PAGE LEFT INTENTIONALLY BLANK...

Page 56: ...forgiving to operate We use quality materials and components Finally every unit is run tested before it leaves the factory That s why we know There s No Better Quality Visit our web sites at www goodm...

Reviews: