VENT/FLUE

TEE

COMBUSTION
AIR INTAKE.

DISTANCE BETWEEN

COMBUSTION AIR

INTAKE AND GRADE

DISTANCE BETWEEN

VENT AND GRADE

For all side wall horizontally vented gas fueled equipment installed
in every dwelling, building or structure used in whole or in part for
residential purposes, including those owned or operated by the
Commonwealth and where the side wall exhaust vent termination
is less than seven (7) feet above finished grade in the area of the
venting, including but not limited to decks and porches, the follow-
ing requirements shall be satisfied:

1. INSTALLATION OF CARBON MONOXIDE DETECTORS. At

the time of installation of the side wall horizontal vented gas
fueled equipment, the installing plumber or gasfitter shall
observe that a hard wired carbon monoxide detector with
an alarm and battery back-up is installed on the floor level
where the gas equipment is to be installed. In addition, the
installing plumber or gasfitter shall observe that a battery
operated or hard wired carbon monoxide detector with an
alarm is installed on each additional level of the dwelling,
building or structure served by the side wall horizontal vented
gas fueled equipment. It shall be the responsibility of the
property owner to secure the services of qualified licensed
professionals for the installation of hard wired carbon
monoxide detectors

a. In the event that the side wall horizontally vented gas fueled

equipment is installed in a crawl space or an attic, the
hard wired carbon monoxide detector with alarm and
battery back-up may be installed on the next adjacent
floor level.

b. In the event that the requirements of this subdivision can

not be met at the time of completion of installation, the
owner shall have a period of thirty (30) days to comply
with the above requirements; provided, however, that
during said thirty (30) day period, a battery operated carbon
monoxide detector with an alarm shall be installed.

2. APPROVED CARBON MONOXIDE DETECTORS. Each

carbon monoxide detector as required in accordance with
the above provisions shall comply with NFPA 720 and be
ANSI/UL 2034 listed and IAS certified.

3.

SIGNAGE. A metal or plastic identification plate shall be
permanently mounted to the exterior of the building at a
minimum height of eight (8) feet above grade directly in line
with the exhaust vent terminal for the horizontally vented
gas fueled heating appliance or equipment. The sign shall
read, in print size no less than one-half (1/2) inch in size,

“GAS VENT DIRECTLY BELOW. KEEP CLEAR OF ALL
OBSTRUCTIONS”.

4.

INSPECTION. The state or local gas inspector of the side
wall horizontally vented gas fueled equipment shall not
approve the installation unless, upon inspection, the
inspector observes carbon monoxide detectors and signage
installed in accordance with the provisions of 248 CMR
5.08(2)(a)1 through 4.

EXEMPTIONS

The following equipment is exempt from 248 CMR 5.08(2)(a)1
through 4:

1.

The equipment listed in Chapter 10 entitled “Equipment
Not Required To Be Vented” in the most current edition of
NFPA 54 as adopted by the Board; and

2.

Product Approved side wall horizontally vented gas fueled
equipment installed in a room or structure separate from
the dwelling, building or structure used in whole or in part
for residential purposes.

(c) MANUFACTURER REQUIREMENTS - GAS EQUIPMENT

VENTING SYSTEM PROVIDED. When the manufacturer
of Product Approved side wall horizontally vented gas
equipment provides a venting system design or venting
system components with the equipment, the instructions
provided by the manufacturer for installation of the
equipment and the venting system shall include:

1.

Detailed instructions for the installation of the venting system
design or the venting system components; and

2.

A complete parts list for the venting system design or venting
system.

(d) MANUFACTURER REQUIREMENTS - GAS EQUIPMENT

VENTING SYSTEM NOT PROVIDED. When the
manufacturer of a Product Approved side wall horizontally
vented gas fueled equipment does not provide the parts
for venting the flue gases, but identifies “special venting
systems”, the following requirements shall be satisfied
by the manufacturer:

1.

The referenced “special venting system” instructions shall
be included with the appliance or equipment installation
instructions; and

2.

The “special venting systems” shall be Product Approved
by the Board, and the instructions for that system shall
include a parts list and detailed installation instructions.

(e) A copy of all installation instructions for all Product

Approved side wall horizontally vented gas fueled
equipment, all venting instructions, all parts lists for
venting instructions, and/or all venting design instructions
shall remain with the appliance or equipment at the
completion of the installation.

S

PECIAL

 I

NSTRUCTIONS

 

FOR

 P

RODUCTS

 I

NSTALLED

IN

 

THE

 S

TATE

 

OF

 M

ASSACHUSETTS

Goodman Manufacturing Company, L.P.

5151 San Felipe, Suite 500, Houston, TX 77056

www.goodmanmfg.com

Summary of Contents for AKSS9/GKS9

Page 1: ...ibility to install the product safely and to know it well enough to be able to instruct a customer in its safe use Safety is a matter of common sense a matter of thinking before acting Most dealers ha...

Page 2: ...ND COMBUSTION AIR PIPING PRACTICES 13 TERMINATION LOCATIONS 13 CANADIAN VENTING REQUIREMENTS 14 STANDARD FURNACE CONNECTIONS 14 ALTERNATE FURNACE CONNECTIONS 14 NON DIRECT VENT SINGLE PIPE PIPING 15 D...

Page 3: ...MODE 31 COOLING MODE 31 FAN ONLY MODE 31 XVI Operational Checks 31 BURNER FLAME 31 XVII Safety Circuit Description 32 GENERAL 32 INTEGRATED CONTROL MODULE 32 PRIMARY LIMIT 32 AUXILIARY LIMIT 32 ROLLOU...

Page 4: ...ANCE DO NOT TOUCH ANY ELECTRICAL SWITCH DO NOT USE ANY PHONE IN YOUR BUILDING IMMEDIATELY CALL YOUR GAS SUPPLIER FROM A NEIGHBORS PHONE FOLLOW THE GAS SUPPLIERS INSTRUCTIONS IF YOU CANNOT REACH YOUR G...

Page 5: ...by the furnace to areas outside the space containing the furnace the return air shall also be handled by duct s sealed to the furnace casing and terminating outside the space containing the furnace A...

Page 6: ...THE UNIT IS IN A BUILDING THAT IS OR WILL BE VACANT CARE SHOULD BE TAKEN TO ROUTINELY INSPECT MAINTAIN AND MONITOR THE UNIT IN THE EVENT THAT THE BUILDING MAY BE EXPOSED TO FREEZING TEMPERATURES AND...

Page 7: ...ow furnace may be the same width as the furnace or may be one size larger than the furnace Example a C width coil may be installed with a B width furnace For upflow applications the front of the coil...

Page 8: ...ostat where it may be influ enced by any of the following Drafts or dead spots behind doors in corners or under cabinets Hot or cold air from registers Radiant heat from the sun Light fixtures or othe...

Page 9: ...atisfactory combustion of gas proper venting and the maintenance of ambient temperature at safe limits under normal conditions of use Equipment shall be located so as not to interfere with proper circ...

Page 10: ...ting of all equipment in the enclosure Outlet air duct Inlet air duct If the appliance room is located against an outside wall and the air openings communicate directly with the outdoors each opening...

Page 11: ...panel s and or basepan For horizontal upflow furnaces return air ductwork must be attached to the basepan NOTE Ductwork must never be attached to the back of the furnace Contact your distributor for...

Page 12: ...dard altitude Propane gas installations require an orifice change to compensate for the energy content difference between natural and propane gas For furnaces being converted to LP gas it is strongly...

Page 13: ...be CSAlisted The solvent cement for the PVC toABS transition joint must meet ASTM D3138 Fittings must be DWV type fittings meetingASTM D2661 andASTM D3311 and if used in Canada must be CSA listed Car...

Page 14: ...ent Vent Flue Terminations Grade or Highest Anticipated Snow Level 3 min 12 min 4 min 12 min Vent Termination Clearances NOTE In Canada the Canadian Fuel Gas Code takes precedence over the preceding t...

Page 15: ...of the alternate vent flue location for upright installations requires the drain trap be installed on the same side of the unit as the flue pipe 8 For horizontal installations externally secure the f...

Page 16: ...e pipe passing through the wall and prohibit damage to piping connections a coupling should be installed on either side of the wall and solvent ce mented to a length of pipe connecting the two couplin...

Page 17: ...strictions The pen etrations through the roof must be sealed tight with proper flashing such as is used with a plastic plumbing vent Horizontal terminations should be as shown in the following figure...

Page 18: ...ation 0 24 Vent termination from wall 8 min 12 max Combustion air intake from wall 6 max Vent and intake clearance to ground or anticipated snow level 12 min ____________________________________ SCREE...

Page 19: ...lets at the same elevation and always terminate all air intakes at the same elevation HOSE A HOSE B SIDE PANEL GROMMET HOLES GREEN HOSE CLAMP 3 PLACES TUBE 1 RUBBER ELBOW RIGHT SIDE PANEL DRAIN TRAP T...

Page 20: ...onnected to drain ports on the rubber elbow and the recuperator coil front cover The drain lines are then routed through the right or left side panel and into the drain trap secured to the outside of...

Page 21: ...e hose to rear right down side panel grommet holes 3 Cut 1 4 inch from the end of the drain port on the rubber elbow and discard 4 Insert Tube 1 into rubber elbow drain port and secure with a silver h...

Page 22: ...diagram for wire routings If any of the original wire as supplied with the furnace must be replaced it must be replaced with wiring material having a temperature rating of at least 105 C Any re placem...

Page 23: ...bination of the lower air density and a lower manifold pressure will prohibit the burner orifice from drawing the proper amount of air into the burner This may cause incomplete combustion flash back a...

Page 24: ...E PROPERTY DAMAGE PERSONAL INJURY OR DEATH MAY OCCUR IF THE CORRECT CONVERSION KITS ARE NOT INSTALLED THE APPROPRIATE KITS MUST BE APPLIED TO ENSURE SAFE AND PROPER FURNACE OPERATION ALL CONVERSIONS M...

Page 25: ...t in operation leak test the unit and gas connec tions TO AVOID THE POSSIBILITY OF EXPLOSION OR FIRE NEVER USE A MATCH OR OPEN FLAME TO TEST FOR LEAKS WARNING Check for leaks using an approved chlorid...

Page 26: ...00 185 390 590 Data in accordance with NFPA pamphlet NO 54 Propane Gas Piping Chart II XIII CIRCULATING AIR FILTERS DUCTWORK AIR FLOW Duct systems and register sizes must be properly designed for the...

Page 27: ...oling coil it is recommended that a removable access panel be provided in the outlet air duct This opening shall be accessible when the furnace is installed and shall be of such a size that the heat e...

Page 28: ...the manual gas shutoff valve external to the furnace 2 Turn off the electrical power to the furnace 3 Set the room thermostat to the lowest possible setting 4 Remove the burner compartment door NOTE...

Page 29: ...se from the hose barb fitting or inlet pressure boss 11 Replace inlet pressure tap a Honeywell VR8215 valve Remove the 1 8 NPT hose barb fitting from the inlet pressure tap Replace the inlet pressure...

Page 30: ...ubic foot Input 1 000 BTU ft3 x 3600 sec hr 34 sec ft3 Input 106 000 BTU hr Minor changes to the input rate may be accomplished through mani fold pressure adjustments at the gas valve Refer to Section...

Page 31: ...ed following a fixed thirty second blower on delay Furnace runs integrated control module monitors safety circuits continuously R and W thermostat contacts open completing the call for heat Gas valve...

Page 32: ...ct electrical components Use the following precautions during furnace installation and servicing to protect the integrated control module from damage By putting the furnace the control and the person...

Page 33: ...ace Toremove 1 Turn OFF electrical power to furnace 2 Remove filter s from the central return register or ductwork 3 Replace filter s by reversing the procedure for removal 4 Turn ON electrical power...

Page 34: ...g is an indication of an operational problem Perform the checks listed in Section XIV Startup Procedure andAdjustments to reduce the chances of repeated fouling XX BEFORE LEAVING AN INSTALLATION Cycle...

Page 35: ...kage proper length elbows and termination Check drain system Correct as necessary Correct pressure switch setpoint or contact motion Tighten or correct wiring connection Pressure switch hose blocked p...

Page 36: ...and circulation blower runs continuously No furnace operation Integrated control module diagnostic LED is flashing FIVE 5 flashes Flame sensed with no call for heat Correct short at flame sensor or i...

Page 37: ...OW 1 5 757 44 753 44 734 45 704 47 674 49 620 524 438 HIGH 3 0 1449 36 1409 37 1326 39 1273 41 1201 43 1194 1136 1018 AKSS90703BX MED 2 5 1192 43 1172 44 1141 45 1094 47 1046 49 973 904 793 MED HI MED...

Page 38: ...LOW 1 5 757 44 753 44 734 45 704 47 674 49 620 524 438 HIGH 3 0 1449 36 1409 37 1326 39 1273 41 1201 43 1194 1136 1018 GKS90703BX MED 2 5 1192 43 1172 44 1141 45 1094 47 1046 49 973 904 793 MED HI ME...

Page 39: ...PED 3 IF ANY OF THE ORIGINAL WIRE AS SUPPLIED WITH THE FURNACE MUST BE REPLACED IT MUST BE REPLACEDWITH WIRING MATERIAL HAVING A TEMPERATURE RATING OF AT LEAST 105 TERMINAL SWITCH PRESS 5 UNIT MUST BE...

Page 40: ...fueled heating appliance or equipment The sign shall read in print size no less than one half 1 2 inch in size GAS VENT DIRECTLY BELOW KEEP CLEAR OF ALL OBSTRUCTIONS 4 INSPECTION The state or local ga...

Reviews: