If a flexible liner is to be used, it must be made of the proper
materials:

• For most residential applications, an aluminum liner should

be acceptable.

• If the combustion air supplied to the furnace will be

contaminated with compounds containing chlorine or
fluorine, a liner of AL294C stainless steel should be used.
Common sources of chlorine and fluorine compounds
include indoor swimming pools and chlorine bleaches, paint
strippers, adhesives, paints, varnishes, sealers, waxes
(which are not yet dried) and solvents used during
construction and remodeling. Various commercial and
industrial processes may also be sources of chlorine/
fluorine compounds.

• Heavier gauge 300 and 400 series stainless steel liners

were developed for use with oil or solid fuel appliances.
They are not suitable for use with gas-fired appliances.
Flexible liners specifically intended and tested for gas
applications are listed in the UL “Gas and Oil Equipment
Directory”. (UL Standard 1777).

For sizing of flexible liners, see Note 22 and the tables in the
National Fuel Gas Code NFPA 54/ANSI Z223.1 - latest edition
and in the National Standard of Canada, CAN/CSA B149.1 and
CAN/CSA B149.2 - latest editions and amendments.

To install the liner, read and follow the liner manufacturer’s
instructions and your local codes. Excess liner length should be
pulled out of the chimney and cut off. Use caution when doing
this, as the cut edges of flexible liners may be sharp. Do not spiral
excess liner inside of the chimney. Support the liner as
recommended by the liner manufacturer.

Some manufacturers of flexible liners offer an insulation sleeve
designed to be added to the liner before it is installed in the
chimney. (Poured insulation, either vermiculite or other materials,
is no longer recommended.) Insulation will need to be added to
the flexible liner if:

• It is required by the liner manufacturer’s instructions.
• The previous liner was properly sized and installed, and

suffered from condensation damage.

• It is required by your local building codes.

Even if none of those three conditions exist which require additional
liner insulation, the installer may wish to consider it if:

• The local climate is very cold.
• The chimney is very tall.
• The vent connectors used are very long or have a large

number of elbows.

• Local experience indicates that flexible liners installed

without insulation are likely to have condensation problems.

Insulation must be selected and installed in accordance with the
liner manufacturer’s instructions.

Finally, cap the chimney and terminate the liner in accordance
with the liner manufacturer’s instructions.

VIII. ELECTRICAL CONNECTIONS

WARNING

T

O AVOID THE RISK OF ELECTRICAL SHOCK, WIRING TO THE UNIT MUST BE

POLARIZED AND GROUNDED.

F

IX

 1 - L

INER

 

TERMINATION

Any cap or roof assembly used with a liner must be approved by
the liner manufacturer for such use. The liner and cap/roof
assembly must then terminate above the roof in accordance with
the manufacturer’s instructions.

In some cases, a shorter extension above the roof may be possible
with a liner than would be required with a masonry chimney.

For further information on relining, see Fix 4.

F

IX

 2 -C

HANGE

 

VENTING

 

ARRANGEMENTS

If the masonry chimney has more than one channel, it may be
possible to vent the gas appliances into one channel and vent the
solid or liquid fuel appliance(s) into another channel(s). Do not
vent an 80+ Furnace inside of a metal liner with other appliances
vented outside the liner.

Alternatively, the homeowner may agree to discontinue use of the
fireplace (solid fuel appliance). If so, the tile liner must be cleaned
to remove creosote buildup. The fireplace opening must then be
permanently sealed.

If oil-fired appliance(s) are being replaced by gas-fired
appliance(s), the tile liner must first be cleaned to remove the fuel
oil residue.

If none of the above options is practical, the furnace may need to
be vented vertically with a B Vent.

Under some conditions, Furnace *9 could be installed rather than
an *8. The * 9 can be vented horizontally or vertically through
PVC pipe.

F

IX

 3 - R

EBUILD

 

THE

 

CROWN

If the chimney crown is damaged, a qualified mason must repair it
in accordance with nationally recognized building codes or
standards. One such standard which may be referenced is the
Standard for Chimneys, Fireplaces, Vents, and Solid Fuel Burning
Appliances, ANSI/NFPA 211.

F

IX

 4 - R

ELINING

Relining options include B vent and flexible liners.

If the chimney has diagonal offsets, B vent probably cannot be
used.

If  B vent is to be used, it must be supported adequately. Supports
(such as fire stops or thimbles) must be used to prevent the B
vent from coming into direct contact with the tile liner or chimney
walls. Direct contact would result in higher heat loss, with an
increased possibility of poor venting system performance.

It is not acceptable to vent one appliance inside the B vent and
other appliances outside. The excess space between the B vent
and the chimney walls must be covered at the top of the chimney
by a weatherproof, corrosion resistant flashing.

The B vent should then be topped with a listed vent cap. The
listed vent cap will, when installed per the manufacturer’s
instructions, prevent problems due to rain, birds, or wind effects.

A B-vent installed as described in this section is considered to be
an enclosed vent system, and the sizing tables in National Fuel
Gas Code NFPA 54/ANSI Z223.1 - latest edition and in the National
Standard of Canada, CAN/CSA B149.1 and CAN/CSA B149.2 -
latest editions and amendments may be used.

Summary of Contents for GMV8

Page 1: ...han when the unit is in operation Remember it is your responsibility to install the product safely and to know it well enough to be able to instruct a customer in its safe use Safety is a matter of co...

Page 2: ...HECK 3 CHIMNEY CROWN CONDITION 13 CHECK 4 DEBRIS IN CLEANOUT 13 CHECK 5 LINER CONDITION 13 CHECK 6 DILUTION AIR 13 CHECK 7 COMPLETE THE INSTALLATION 13 FIX 1 LINER TERMINATION 14 FIX 2 CHANGE VENTING...

Page 3: ...MPERATURE RISE 25 CIRCULATOR BLOWER SPEED ADJUSTMENT 25 ADJUST BLOWER HEAT OFF DELAY 27 CIRCULATOR BLOWER FAN TIMING ADJUSTMENT 27 XIII OPERATIONAL CHECKS 27 BURNER FLAME 27 AUXILIARY LIMIT CONTROL 27...

Page 4: ...ponent failures could result in heating system operational problems TO THE INSTALLER Before installing this unit please read this manual thoroughly to familiarize yourself with specific items which mu...

Page 5: ...stalling the control on a furnace Return any old or new controls to their containers before touching any ungrounded object III PRODUCT APPLICATION This furnace is primarily designed for residential ho...

Page 6: ...ents and glues antistatic fabric softeners for clothes dryers and masonry acid washing materials WARNING POSSIBLE PROPERTY DAMAGE PERSONAL INJURY OR DEATH DUE TO FIRE EXPLOSION SMOKE SOOT CONDENSTAION...

Page 7: ...ATOR BLOWER REMOVAL 3 8 DIAMETER THREADED ROD 6 PLACES PROVIDE 8 MINMUM CLEARANCE BETWEEN CENTER ROD AND FURNACE CABINET TO ALLOW FOR CIRCULATOR BLOWER REMOVAL ASSURE FURNACE IS LEVEL FROM END TO END...

Page 8: ...an 50 cubic feet per 1 000 BTU per hour of the aggregate input rating of all appliances installed in that space Rooms communicating directly with the space in which the appliances are installed throug...

Page 9: ...sure Inlet Air Ventilation louvers for unheated crawl space Alternate air inlet Ventilation louvers each end of attic Equipment Located in Confined Spaces All Air from Outdoors Inlet Air from Ventilat...

Page 10: ...eration of installed gas utilization equipment VI CATEGORY I VENTING VERTICAL VENTING WARNING TO PREVENT POSSIBLE PERSONAL INJURY OR DEATH DUE TO ASPHYXIATION THIS FURNACE MUST BE CATEGORY I VENTED DO...

Page 11: ...ng In most situations the existing masonry chimneys will require a properly sized metallic liner WARNING POSSIBILITY OF PROPERTY DAMAGE PERSONAL INJURY OR DEATH DAMAGING CONDENSATION CAN OCCUR INSIDE...

Page 12: ...condition Check 5 Yes Yes No Reline Fix 4 Dilution air available Check 6 Complete the installation Check 7 CHECK 1 PROPER CHIMNEY TERMINATION A masonry chimney used as a vent for gas fired equipment...

Page 13: ...seal Use caution when doing this as the cut edges of flexible liners may be sharp The surfaces of the liner must be physically sound If gaps or holes are present the metal liner must be removed and r...

Page 14: ...F ELECTRICAL SHOCK WIRING TO THE UNIT MUST BE POLARIZED AND GROUNDED FIX 1 LINER TERMINATION Any cap or roof assembly used with a liner must be approved by the liner manufacturer for such use The line...

Page 15: ...SK OF INJURY ELECTRICAL SHOCK OR DEATH THE FURNACE MUST BE ELECTRICALLY GROUNDED IN ACCORDANCE WITH LOCAL CODES OR IN THEIR ABSENCE WITH THE LATEST EDITION OF THE NATIONAL ELECTRIC CODE WARNING EDGES...

Page 16: ...m located on the blower compartment door for further details of 115 Volt and 24 Volt wiring SINGLE STAGE THERMOSTAT APPLICATION W G Y Single Stage Heating with Single Stage Cooling R B C G R W1 W2 O Y...

Page 17: ...G R W1 W2 CR35 R122 R128 W3 DS7 R191 R85 DS3 R84 R22 DS4 DS5 TP1 TP2 DEHUMIDIFICATION LED YELLOW DEHUMIDIFICATION JUMPER WIRE CUT TO ENABLE W 14 FOSSIL FUEL APPLICATIONS This furnace can be used in co...

Page 18: ...cause poor combustion and equipment failure When this furnace is installed at high altitude the appropriate High Altitude orifice kit must be applied The furnace is supplied with orifices sized for na...

Page 19: ...ranges and pressure switch kits High Low 70 90 115 7 500 0 5 w c 0 3 w c NR Pressure Switch Changes Setting Furnace Input kBtu hr Altitude ft PROPANE GAS CONVERSION WARNING POSSIBLE PROPERTY DAMAGE P...

Page 20: ...1 8 Pipe Plug To Measure Line Gas Pressure General Furnace Layout UPFLOW INSTALLATIONS When the gas piping enters through the right side of the furnace the installer must supply the following fitting...

Page 21: ...50 330 770 1 500 2 400 3 700 1 500 3 400 60 300 700 1 300 2 200 3 300 1 300 3 100 80 260 610 1 200 1 900 2 900 1 200 2 600 100 220 540 1 000 1 700 2 600 1 000 2 300 125 200 490 900 1 400 2 300 900 2 1...

Page 22: ...g to the low heat circulating speed from entering the furnace and if manually operated must be equipped with means to prevent operation of either unit unless the damper is in the full heat or cool pos...

Page 23: ...acts open completing the call for heat Gas valve closes extinguishing flame Induced draft blower is de energized following a fifteen second post purge Humidifier terminals are de energized Circulator...

Page 24: ...um 13 0 w c Inlet Gas Supply Pressure If supply pressure differs from table make the necessary adjustments to pressure regulator gas piping size etc and or consult with local gas utility 5 Turn OFF ga...

Page 25: ...eed If the correct amount of temperature rise is not obtained it may be necessary to change the blower speed An incorrect temperature rise can cause condensing in or overheating of the heat exchanger...

Page 26: ...he motor then ramps to 100 of the required airflow A 1 minute OFF delay at 100 of the cooling airflow OFF 100 CFM Cooling Demand 100 CFM 1 min 50 CFM OFF min Profile C ramps up to 82 of the full cooli...

Page 27: ...econds after the call for cooling ends During normal heating operation the circulator fan will come on approximately 37 seconds after the gas valve opens ON OFF ON OFF ON OFF ON OFF 1 2 1 2 1 2 1 2 90...

Page 28: ...and monitors heat exchanger compartment temperatures It is an automatic reset temperature sensor The limit guards against the overheating as a resulting of insufficient air passing over the heat excha...

Page 29: ...means of filtering all of the return air The installer will supply filter s at the time of installation FILTER MAINTENANCE Improper filter maintenance is the most common cause of inadequate heating o...

Page 30: ...t off electric power and gas supply to the furnace 2 Remove screws securing manifold to burner bracket Slightly pull manifold out and away from burner bracket Burners will drop Re secure manifold to b...

Page 31: ...it Inspect pressure switch hose Repair if necessary Inspect flue for blockage proper length elbows and termination Correct pressure switch setpoint or contact motion Tighten or correct wiring connecti...

Page 32: ...or proper sensor alignment Check inlet air piping for blockage proper length elbows and termination Compare current gas pressure to rating plate info Adjust as needed Turn power OFF prior to repair Tu...

Page 33: ...RLY O N SO M E M O D ELS IN DU C T OR C O IL P R ES S U RE SW ITC H LO W FIR E Y L R D BK W H IN DU C E D B R G N D WH WH BK BR RD GN BU BR W H A U XILIA R Y LIM IT C O NT R OLS R D B U W H VAC 115 VA...

Page 34: ...ct failure They are simple to service and forgiving to operate We use quality materials and components Finally every unit is run tested before it leaves the factory That s why we know There s No Bette...

Reviews: