STEP 3 - RUNWAY INSTALLATION
3.1
Lift the runway/monorail into place for installation.
3.2
Hangers
For hangers with threaded rod drop:
Insert threaded rod into bolt hole on
the lower hanger assembly and bolt
into place (
diagram 3A
).
Torque nuts (
chart 2A
, page 2, for
proper torque rating).
For flush mounted hangers:
Bolt flush mounted hanger and beam
clips to building support beam
(
diagram 3B
).
Torque nuts (
chart 2A
, page 2,
for proper torque rating).
TIP:
The closer the runways/monorails are to level and
parallel, the better the crane will perform.
Æ
WARNING
Threaded rod must have a minimum of two threads
beyond the hexnut.
WARNING
Threaded rod must be allowed to hang “plumb” and
should
not
be bent to accommodate sloped ceilings.
Untrussed (Plain) Track
Trussed Track
Diagram 3A.
Attaching lower hanger assembly to top hanger assembly.
Parallel Flush Mounted
Perpendicular Flush Mounted
Diagram 3B.
Attaching flush mounted hangers to building support beam.
5
9/05
Bridge Crane
Monorail
Summary of Contents for AL 1000
Page 1: ......