background image

14

9/18

STEP 6 - ACCESSORIES (OPTIONAL) INSTALLATION

6.2   INSTALLING BLOWER PLATFORM (

diagram 6B

)

    A)  Transfer blower mounting pattern to the blower    

         platform.  Allow room for hose connections.  Verify  

         blower mounting hole locations are far enough    

         away from blower platform verticals to allow for    

         mounting hardware.
    B)  Drill top of platform for blower mounting.
    C)  Position blower platform on mast and align  3/8”-16  

         tapped holes in mast with countersunk holes in    

         blower platform verticals.  Note, two strap slots    

         are provided in the platform to assist in positioning.
    D)  Install 3/8”-16 x ¾”long flat head cap screws with   

         7/32” allen wrench.  Tighten to 20 ft-lbs.
    E)  Position blower onto platform and continue 

            connections as required per blower manufacturer’s instructions.

6.3   INSTALLING FILTER BRACKET (

diagram 6C

)

    The filter bracket allows for weld-free mounting of the blower  

    filter.  Review the filter manufacturers instructions for proper 

    filter orientation.   The filter bracket can be mounted vertically  

    or horizontally depending on the filter’s bolt hole locations.

    A)  Transfer filter mounting pattern to the filter bracket.
    B)  Drill filter bracket for filter mounting.
    C)  Position filter bracket on mast and align 3/8”-16 tapped 

            hole in mast with countersunk hole in filter bracket.
    D)  Install 3/8”-16 x 1-1/2” long flat head cap screws with 

         7/32” allen wrench.  Tighten to 20 ft-lbs.
    E)  Position filter on bracket and continue connections as 

          required per filter manufacturer’s instructions.

Diagram 6B.

  Installing blower platform

Diagram 6C.

  Installing filter 

bracket 

SPAN CAPACITY

50#

75#

100#

150#

8’

Model Number

PB-48-10

PB-48-10

PB-48-12

PB-54-12

Square Length

48”

48”

48”

54”

Thickness

1”

1”

1.25”

1.25”

Shipping Weight

696#

696#

858#

1098#

10’

Model Number

PB-48-10

PB-48-12

PB-54-12

PB-60-12

Square Length

48”

48”

54”

60”

Thickness

1”

1.25”

1.25”

1.25”

Shipping Weight

696#

858#

1098#

1363#

12’

Model Number

PB-48-12

PB-54-12

PB-60-12

PB-60-15

Square Length

48”

54”

60”

60”

Thickness

1.25”

1.25”

1.25”

1.5”

Shipping Weight

858#

1098#

1363#

1617#

Table 6.1. 

 Portable Base & Jib compatibility

FLAT HEAD

SCREW

FILTER

BRACKET

Summary of Contents for Free Standing PIVOT PRO

Page 1: ...ANT DO NOT DESTROY Installation Operation Maintenance Manual Month Year Gorbel Dealer Date PIVOT PRO Articulating Jib Crane Gorbel Customer Order No Serial No Wall Mounted PIVOT PRO Free Standing PIVO...

Page 2: ...lation 6 7 Step 3 PIVOT PRO Free Standing Mast Installation 8 9 Step 4 PIVOT PRO Free Standing Boom Installation 10 11 Step 5 Vacuum Hose Installation 12 Step 6 Accessories Optional Installation 13 15...

Page 3: ...standard fabrication practices should be employed to assemble these cranes because of the necessity of properly interpreting these instructions Gorbel is not responsible for the quality of work mansh...

Page 4: ...ve action taken Operating Suggestions One measure of a good crane operator is the smoothness of the crane operation The good crane operator should know and follow these proven suggestions for safe eff...

Page 5: ...well as time and money DON TS HOISTS VACUUM LIFTERS 1 Never lift or transport a load until all personnel are clear and do not transport the load over personnel 2 Do not allow any unqualified personne...

Page 6: ...hardware box General Arrangement Drawing can be found inserted in this installation manual WARNING Consult a qualified structural engineer to determine that your support structure is adequate to suppo...

Page 7: ...O FS 50 12 12 T PPRO FS 50 12 12 B 916 75 10 8 PPRO FS 75 10 8 T PPRO FS 75 10 8 B 668 10 PPRO FS 75 10 10 T PPRO FS 75 10 10 B 897 12 PPRO FS 75 10 12 T PPRO FS 75 10 12 B 1142 12 8 PPRO FS 75 12 8 T...

Page 8: ...re 2 5 Clean pivot pins with clean dry cloth Slide bearings on pivot pins Be sure to orient bearings correctly diagram 2C 2 6 Lift boom weldment up and insert lower pivot pin into lower pivot mounting...

Page 9: ...nment 2 11 Attach two brake pads to the lower pivot mounting assembly using two 1 4 socket head cap screws lock washers and lock nuts diagram 2F 2 12 Adjust brake by tightening two lock nuts to achiev...

Page 10: ...acks or seams in a 48 square area around center of mast Note Chemical epoxy anchor bolts are recommended because of their ability to withstand the vibrating loads caused by the rapid raising or loweri...

Page 11: ...st plate approximately where cam followers will contact mast pipe distance between plumb line and face of mast should also be three 3 inches F Repeat steps D E every 60 around the mast to ensure that...

Page 12: ...in hole is slightly offset This collar may be installed in one of two ways flipped to act as a 0 025 thick shim When properly shimmed the holes on safety collar and pivot pin will be aligned Using ham...

Page 13: ...g for 45 adjustment increments Two rotation limits are supplied with the Free Standing PIVOT PRO A Swing boom to maximum rotation in one direction B Back off boom rotation until first available hole i...

Page 14: ...Install fittings into 2 NPT couplings of boom Do NOT over tighten PVC fittings should not be tightened more than 2 turns past finger tight 5 4 Place hose clamp over hose end push hose end over barbed...

Page 15: ...MUST BE supported by all four adjustable feet and NOT by the fork pockets Tighten jam top nut D Secure boom or assemble mast to base prior to boom assembly E Lower mast onto protruding bolts of base...

Page 16: ...ientation The filter bracket can be mounted vertically or horizontally depending on the filter s bolt hole locations A Transfer filter mounting pattern to the filter bracket B Drill filter bracket for...

Page 17: ...6 18 x 3 4 long hex head cap screw Tighten to 15 ft lbs C Position your lifter tube controls onto the smart hook 6 5 INSTALLING ROTATION STOPS ON WALL MOUNTED PIVOT PRO diagram 6E Contact Gorbel Custo...

Page 18: ...hers are compressed 7 2 If necessary touch up crane with paint provided 7 3 Keep Packing List Installation Manual General Arrangement Drawing and any other inserts filed together in a safe place TIP D...

Page 19: ...TOR NOT AN AGENT Gorbel and Purchaser agree that Purchaser has been put on notice that dealer or distributor is not Gorbel s agent in any respect for any reason Gorbel and Purchaser also agree that Pu...

Page 20: ...and square washer are properly installed so that boom cannot dislodge Every 2000 hours or yearly 5 Rotation Limits Check for deformation Make sure that bolt is tightened Replace block if deformed Eve...

Reviews: