18
9/18
FREE STANDING
PIVOT PRO®
WALL MOUNTED
PIVOT PRO®
600 Fishers Run, P.O. Box 593
Fishers, NY 14453-0593
Phone: (800) 821-0086
Fax: (800) 828-1808
E-Mail: info@gorbel.com
http://www.gorbel.com
© 2012 Gorbel Inc.
All Rights Reserved
GORBEL® PIVOT PRO® INSPECTION AND MAINTENANCE SCHEDULE
ITEM COMPONENT
MAINTENANCE
FREQUENCY*
1
Mounting Bolts
and Anchor Bolts
Check that lock washers are compressed and nuts tightened to
manufacturer’s specifications.
Every 500 hours
or 3 months
2
Clevis Pin
Check that cotter pin is properly installed. Check that clevis pin is
not deformed.
Every 2000 hours
or yearly
3
Cam Followers
Check to make sure both rollers have full face contact with pipe. Make
sure nylock nuts are tight.
Every 1000 hours
or 6 months
4
Pivot Pins
Check that cotter pin, spring pin, and square washer are properly
installed so that boom cannot dislodge.
Every 2000 hours
or yearly
5
Rotation Limits
Check for deformation. Make sure that bolt is tightened. Replace
block if deformed.
Every 1000 hours
or 6 months
6
Arm Rotation
Adjust friction brakes to achieve desired rotational resistance.
Every 1000 hours
or 6 months
7
Accessory Items
Conduct a general inspection of all accessory items.
Every 1000 hours
or 6 months
8
Gorbel® Crane
Conduct a visual inspection of the crane overall.
Every 1000 hours
or 6 months
9
Vacuum Tube
Lifter
Conduct a visual inspection of the vacuum tube lifter overall.
According to
Manufacturer’s
Requirements
5
2
6
4
4
Facebook.com/gorbelinc
Twi� er
twi� er.com/gorbelinc
linkedin.com/company/gorbel
youtube.com/gorbelmarke� ng
gorbel.com/blog
WARNING
This product can expose you to chemicals, including acrylonitrile,
which are known to the State of California to cause cancer. For
more information go to:
www.P65Warnings.ca.gov