8B.7
Install the towing trolley or pendant trolley. Alternate method would be to install all trolleys
and cable into one length of C-Track and lift into place.
8B.8
Install second hanger endstop into open end of C-Track.
8B.9
The selected cable connectors can be installed in the appropriate junction boxes anmd the
cable connected.
8B.10
Repeat the above steps as necessary for second C-Track.
STEP 9 - ENCLOSURE MOUNTING DETAIL (PRE-ASSEMBLED)
9.1
Clamp enclosure mounting bracket to top flange of beam using enclosure mounting
bracket hardware provided.
9.2
Attach enclosure box to face of brackets using hardware provided.
Diagram 9A.
Enclosure Assembly.
15
9/18 Rev. F
WARNING
Verify panel and mounting brackets are positioned to avoid hoist interference.