12
5 ASSEMBLY
INSTRUCTIONS
5.1 BOILER
ACCESSORIES
Follow the instructions to finish the assembly of boiler accessories supplied together with the
boiler
1. Before assembly of boiler accessories, we recommend completing water inlet and
outlet connections and fitting of thermostatic controller on ¾” port on top of boiler,
together with all devices on water circuit. Then, feed the whole system with water to
check any leak. Start assembly of accessories pack.
2. Loose self tapping screws that fix top panel to rear panel, and take top panel from its
housing, loose setscrew that fix front upper cast part to side casings, to continue with
installation of control panel and its accessories. Control panel has three sets of wiring
for different equipments and sensors. Pass those three wiring sets through
corresponding holes cut on the top panel as seen in the following pictures.
kotlovoy.com.ua