1 K
Lift up the burner housing sheet first in
direction of arrow and then upward
towards the inside of the boiler and pull
towards you to take the sheet out of its
place (figure 21)
·
Remove the mounting screws of the
burner and pull the burner by 15mm to
release the burner (figure 22).
·
If there is lighter and thermo element
on the burner, remove the fixing rings
and take the parts away from the
burner.
·
After the burner is released, the
injector is removed by help of 7’s
socket spanner and the desired
injector is mounted. See page 22 for
the injector table.
Figure
21
Figure 22
·
Untighten the screw of tha air adjusting screw on
the burner and bring the corresponding letter of
the desired gas type you want to adjust to the
same axis of the screw and tighten the screw.
You should bring it to GPL indicated on the air
adjusting sheet for LPG.
For NG, you should bring it to ‘N’ on the air
adjusting sheet.
Segman
Leakege control;
Open the valve or natural gas valve and apply soap water with ample foam to the
connection point to control for gastight.
Never control by flame.
Final control
1. Plug the power cable into the socket and activate fuse of the equipment.
2. Control the functions.
Placement
Place your product after you control the required power and gas connection.
When placing, make sure that the gas hose and power cable is not near the hot
surface of the product.