For technical product queries, please reach out to techsupport@globalplasmasolutions.com
Thank you for purchasing a DM-2
™
air ionization system from Global Plasma Solutions.
What's Included
Before you start, confirm the contents of your shipment. Each DM-2 will consist of the following:
1. DM-2 Air Ionization System (1)
2. Mounting ring (1)
3. Self drilling sheet metal screws (4)
4. Expanding anchors with screws (4)
T
(1)
(1)
(4)
(4)
Supplies Not Included
1. 4-inch hole saw or snips
2. Sealant to make duct air/water tight after installation, if required
3. Electrical junction box to bring power into the vicinity of the DM-2
4. Appropriate conduit and wiring as detailed below in step 3
Location
For best results install the DM-2 as close to the conditioned space as possible. This will minimize losses
throughout ductwork.
NOTE:
Use temperature - Maximum ambient temperature in which unit shall be used: 140
°
F/60
°
C.
For VAV and other mixing box installations, install on discharge/supply side of box.
The information provided in this manual is up to date at the
time of printing. Any revisions to this document will supersede
the content included. For the latest applicable version of this
manual, visit our website or utilize the QR code below.
e DM-2IOM