23
1. Install the other long track support over the front of the middle leg. Make sure the
vertical
edge
is towards the front of the frame. Loosely attach the track support with four
M6 x 10
mm connector bolts
and the 4 mm Allen wrench.
2
1. Install the four
short track supports
, lining them up with the long track supports that are
already installed. Loosely attach the track supports with eight
M6 x 10 mm connector bolts
and the 4 mm Allen wrench.
3
Connector Bolt
M6 x 10 mm (x4)
Connector Bolt
M6 x 10 mm (x8)
1.
Adjust the front track supports until the vertical edges are flush with the front of the cross
support tubes. Tighten the eight front
M6 x 10 mm connector bolts
with the 4 mm Allen
wrench.
4
Connector Bolt
M6 x 10 mm (x8)
Short Track
Support (x4)
Task 3 - Install and Align the Tracks (continued)
Vertical Edge
Queen Assembly Part One
Summary of Contents for Q-Zone Queen
Page 1: ...Assembly Instructions Copyright December 3 2021 V2 0 Grace Company ...
Page 2: ......
Page 13: ...13 Queen Assembly ...
Page 44: ...44 Crib Assembly ...
Page 72: ...72 Repeat the process with machine on the right side of the frame 4 Crib Assembly Part Three ...
Page 84: ...The Grace Company Phone 1 800 264 0644 www graceframe com ...