51
1.
Repeat steps 7-8 for the rear cross support tube.
Connector Bolt
M6 x 10 mm (x2)
9
Task 2 - Install the Cross Support Tubes (continued)
1.
Loosely attach the other end of the cross support tube to the front corner brace on the right leg
using two
M6 x 10 mm connector bolts
and the 4 mm Allen wrench.
8
Crib Assembly Part One
1.
Once the braces and tubes are all in place, pull the bottoms of the left and right legs outwards
to make sure they are square with the cross support tubes. Go around and tighten all 24 M6 x
10 mm connector bolts to secure the frame pieces.
10
Summary of Contents for Q-Zone Queen
Page 1: ...Assembly Instructions Copyright December 3 2021 V2 0 Grace Company ...
Page 2: ......
Page 13: ...13 Queen Assembly ...
Page 44: ...44 Crib Assembly ...
Page 72: ...72 Repeat the process with machine on the right side of the frame 4 Crib Assembly Part Three ...
Page 84: ...The Grace Company Phone 1 800 264 0644 www graceframe com ...